background image

 

2021 

150mm Free Standing Wood fire Flue Kit  

Installation Instructions 

 

WARNING: FLUE KITS MUST BE MANUFACTURED IN ACCORDANCE WITH AS/NZS 2918:2001 AND 

TESTED TO APPENDIX F. TO ENSURE SAFETY THIS FLUE KIT MUST BE INSTALLED AS 

OUTLINED IN THESE INSTRUCTIONS AND THE APPROPRIATE REQUIREMENTS OF 

THE RELEVANT BUILDING CODE OR CODES. WOOD FIRE AND FLUE CLEARANCES 

FROM COMBUSTIBLE WALLS MUST BE IN ACCORDANCE WITH WOOD FIRE 

MANUFACTURER’S SPECIFICATIONS AND AS/NZS 2918:2001.  

The Wagener Fairburn uses a 150mm diameter flue. It is imperative that the connection between the flue and 

the flue flange is sealed using a suitable flue sealant/fire cement. If an offset bend is required it should be as 

steep as possible to enable ease of cleaning. Extra flue height may be required to compensate for any lack of 

draw through a bend. The performance of the Wagener Fairburn depends more on the flue than on any other 

single component as it is the draw on the flue that drives the Fairburn. 

We recommend 4.8 metres of 

flue for optimum performance. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The top of the flue system should be at least 1000mm above the roof or at least 600mm higher than any 

obstacle or ridge within 3 metres of the flue. The flue pipe shall extend not less than 4.6M ABOVE the floor 

protector. However a total minimum vertical height of 4.8 metres is recommended for optimum 

performance. Joints between sections of the flue pipes are push fitted so that the upper section enters the 

bottom section and must be SEALED using a suitable flue sealant/fire cement.

 

Each section should be secured 

to prevent separation using three monel steel rivets.  

 

PLEASE FOLLOW STEP BY STEP INSTRUCTIONS ON PAGE 5  

 

Clean flue pipes before lighting the fire

. Stainless Steel pipe should be wiped clean using a soft cloth and 

methylated spirits to remove finger marks and oils used to manufacture the flue pipe. Hi-Therm flue pipe can 

be touched up if required using only STOVE BRIGHT aerosol paint. 

 

Please leave all installation and operating instructions with the owner 

 

2021 

 

150mm Free Standing Wood Fire Flue Kit  

Installation Instructions continued 

 

1.

 

Locate Wood Fire in its proposed position and mark a point on the ceiling that is directly above the centre of 
the Wood Fire’s Flue Flange. Check that the Wood Fire’s location allows the OUTER CASING to clear all 
structural roof timbers. 

2.

 

Cut a 250mm square hole in ceiling. Directly above cut a hole in the roof to accommodate the OUTER 
CASING. 

3.

 

Fit timber nogs around ceiling. Nogs form a 250mm square aperture that allows air to circulate freely over the 
OUTER CASING surface. 

4.

 

Position the OUTER CASING so that it is flush with the underneath of the ceiling and protrudes through the 
roof at the required height. Note that AS/NZS 2918:2001 4.9.1(a) states “the FLUE PIPE shall extend not less 
than 4.6m above the top of the floor protector. Refer diagram page 4 
a.

 

If the FLUE PIPE is within 3 metres of the ridge, the FLUE PIPE must protrude at least 600mm above the 
ridge of the roof. 

b.

 

b. If the distance from the ridge is more than 3 metres, the FLUE PIPE must protrude at least 1000mm 
above roof penetration. 

c.

 

The FLUE PIPE must be more than 3 metres away from any nearby structure. Refer diagram page 4 

Additional FLUE PIPE, OUTER CASING and INNER CASING may have to be added to ensure the following: 

a.

 

 The correct minimum roof penetration height. 

b.

 

Sufficient overall height to encase the FLUE PIPE which must extend a minimum of 4.6 metres from the 
floor protector. (4.8 metres for optimum performance) 

Note: the INNER CASING should extend 200mm above roof penetration. Do not secure the OUTER CASING SLIP 

EXTENSION onto the OUTER CASING, as final adjustment will be required when fitting cowl assembly.  

5.

 

Fix an appropriate flashing around the OUTER CASING to seal onto the roofing material. Refer to the 
manufacturer’s recommendations for correct fitting. NB: On iron roofs, fixings such as metal angle brackets 
(approximately 25mm x 25mm) can be fitted under the flashing to securely fix the roof to the OUTER CASING 

6.

 

Drill holes in CEILING PLATE for the fixing screws. Place CEILING PLATE over Wood Fire FLUE FLANGE 
ensuring the folded edges are facing the ceiling. 

7.

 

Position bottom length of FLUE PIPE (crimped end downwards) into the 

FLUE FLANGE.  

8.

 

Use fire cement to seal the joint where the bottom section of FLUE PIPE enters the FLUE FLANGE. 

9.

 

Assemble FLUE PIPES together ensuring seams are straight, offsetting the seams will ensure a neat fit. FLUE 
PIPES must be assembled with crimped ends down (towards Wood Fire). Secure each joint with a minimum of 3 
rivets equally spaced around the joint. If using HI-THERM FLUE PIPE the protective wrapping should be left on 
the FLUE PIPE during installation. 

10.

 

From the roof, lower FLUE PIPE through OUTER CASING into the bottom FLUE PIPE securing with 3 rivets. 

11.

 

Check that the FLUE PIPE SPACING BRACKETS inside the INNER CASING are correctly positioned and then 
from the roof slide the INNER CASING into the OUTER CASING, this will ensure the INNER CASING is the 
correct 12mm above ceiling level. Check the INNER CASING when correctly positioned extends a minimum of 
200mm above the roof penetration

.

 

12.

 

Before securing the OUTER CASING SLIP EXTENSION to the OUTER CASING with 3 rivets, ensure the 
FLUE PIPE is either flush with or extends above the top of the OUTER CASING SLIP EXTENSION by no more 
than 15mm. Adjust SLIP EXTENSION to obtain this measurement. 

13.

 

Push CASING COVER (with collar inside FLUE PIPE) down onto the OUTER CASING SLIP EXTENSION. The 

3 locating brackets with holes must be on the outside of the OUTER CASING SLIP EXTENSION and are 

secured using 3 rivets. 

14.

 

Fit COWL but do not secure, as removal for flue cleaning will be necessary. Deform or ovalise the stub of the 
COWL to ensure it is a tight friction fit. 

15.

 

Fasten CEILING PLATE to ceiling using ceramic spacers and screws provided. Ensure an even air gap around 
FLUE PIPE when fixing. Remove protective plastic from CEILING PLATE. NB: 12mm air gap between ceiling 
plate and ceiling must be maintained.  
 

ANTI DOWN
DRAUGHT COWL

250MM

OUTER

CASING

PERLIN

FLASHING

Inner casing
200mm above 
roof line

150MM

FLUE PIPE

200MM

INNER

CASING

CEILING

PLATE

CERAMIC

CEILING

SPACER

TIMBER
NOGGING

150mm

Flue Pipe

Flue Flange

4.8 Metres  to top of flue pipe

 

Warranty

Sparky CAs

 firebox is 

covered by a 5 year warranty 
(Please refer to Installation & 
Operating Instructions for full 
details).

Wagener Stoves have over 
40 years experience in the 
heating industry and have been 
members of the NZ Home 
Heating Association for over 
30 years.

Other Products 

Manufactured by 

Wagener Stoves

Wagener Stoves also design and 
manufacture “Lion” Wetbacks, the 
CookTop Wagener Stove, Butler 
Multi High Performance Hot Water 
Heaters, Traditional Style Slow 
Combustion Wagener Fairburn 
Cookers, Wagener Sparky and 
Wagener Leon.

WAGENER STOVES "LION" 

LTD

5 Allen Bell Drive, Kaitaia 0410

New Zealand

Phone: 09 408 2469

www.wagenerstoves.co.nz

At Wagener Stoves we are continually 

improving our products and therefore 

specifications and designs may change 

without prior notice

2019

N E

W   Z

E A L A N D   M A D

E

3m

3m

3m

1m (min)

0.6m

or less

More than 3m

*increase flue

height as 

needed to be 

clear by 3m

Roof line

COMBINATION
BRACKET
CASING
COVER

Ash Hearth
Floor Protector

 

2021 

150mm Free Standing Wood fire Flue Kit  

Installation Instructions 

 

WARNING: FLUE KITS MUST BE MANUFACTURED IN ACCORDANCE WITH AS/NZS 2918:2001 AND 

TESTED TO APPENDIX F. TO ENSURE SAFETY THIS FLUE KIT MUST BE INSTALLED AS 

OUTLINED IN THESE INSTRUCTIONS AND THE APPROPRIATE REQUIREMENTS OF 

THE RELEVANT BUILDING CODE OR CODES. WOOD FIRE AND FLUE CLEARANCES 

FROM COMBUSTIBLE WALLS MUST BE IN ACCORDANCE WITH WOOD FIRE 

MANUFACTURER’S SPECIFICATIONS AND AS/NZS 2918:2001.  

The Wagener Fairburn uses a 150mm diameter flue. It is imperative that the connection between the flue and 

the flue flange is sealed using a suitable flue sealant/fire cement. If an offset bend is required it should be as 

steep as possible to enable ease of cleaning. Extra flue height may be required to compensate for any lack of 

draw through a bend. The performance of the Wagener Fairburn depends more on the flue than on any other 

single component as it is the draw on the flue that drives the Fairburn. 

We recommend 4.8 metres of 

flue for optimum performance. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The top of the flue system should be at least 1000mm above the roof or at least 600mm higher than any 

obstacle or ridge within 3 metres of the flue. The flue pipe shall extend not less than 4.6M ABOVE the floor 

protector. However a total minimum vertical height of 4.8 metres is recommended for optimum 

performance. Joints between sections of the flue pipes are push fitted so that the upper section enters the 

bottom section and must be SEALED using a suitable flue sealant/fire cement.

 

Each section should be secured 

to prevent separation using three monel steel rivets.  

 

PLEASE FOLLOW STEP BY STEP INSTRUCTIONS ON PAGE 5  

 

Clean flue pipes before lighting the fire

. Stainless Steel pipe should be wiped clean using a soft cloth and 

methylated spirits to remove finger marks and oils used to manufacture the flue pipe. Hi-Therm flue pipe can 

be touched up if required using only STOVE BRIGHT aerosol paint. 

 

Please leave all installation and operating instructions with the owner 

Содержание Fairburn

Страница 1: ...W A G E N E R Fairburn Installation Operation Maintenance INSTRUCTIONS Designed Handcrafted in New Zealand Designed Handcrafted in New Zealand ...

Страница 2: ...ualise for 15 20 minutes Now your oven is ready for use Place your food in the oven close the oven door and your oven should maintain its temperature If additional wood is required first open the flue control to spill fire gases directly up the flue Using the tool provided lift the hot plate situated directly above the fire box up 5mm for 1 2 seconds then remove to add the required wood and then r...

Страница 3: ...solid fuel heating appliances are installed Permits will not be signed off if alarms are not fitted Important Message to the Installer These installation instructions are the results of performance tests on the Wagener Free Standing Multi Fuel Cooking Range Fairburn Radiant in accordance with AS NZ 2918 2001 Domestic Solid Fuel burning appliances Installation Clearance tests were carried out by an...

Страница 4: ...ector shall have an upper surface including grouting if required of a durable non combustible material eg Tiles slate treadle plate etc All joints in the surface must be sealed to protect and prevent ash or spilled embers reaching the floor Floor protection shall extend under the cooker and not less than the width of the cooker and shall extend forward 300mm and be 200mm from the side of the fireb...

Страница 5: ...nd odour for rt period This is a temporary condition Open doors and windows to give adequate ventilation please dditional sheet on paint supplied with these instructions To condition the firebricks your first 2 3 fires be small rt Up Rotate the air control black round plate beneath the firebox door glass to the open position so that the widest air opening is obtained Caution refer Over firing sect...

Страница 6: ...OOD FIRE AND FLUE CLEARANCES FROM COMBUSTIBLEWALLS MUST BE IN ACCORDANCEWITHWOOD FIRE MANUFACTURER S SPECIFICATIONS AND AS NZS 2918 2001 TheWagener Fairburn uses a 150mm diameter flue It is imperative that the connection between the flue and the flue flange is sealed using a suitable flue sealant fire cement If an offset bend is required it should be as steep as possible to enable ease of cleaning...

Страница 7: ...ximately 25mm x 25mm can be fitted under the flashing to securely fix the roof to the OUTER CASING 6 Drill holes in CEILING PLATE for the fixing screws Place CEILING PLATE over Wood Fire FLUE FLANGE ensuring the folded edges are facing the ceiling 7 Position bottom length of FLUE PIPE crimped end downwards into the FLUE FLANGE 8 Use fire cement to seal the joint where the bottom section of FLUE PI...

Страница 8: ...PENING FIRE BOX DOOR 7 CAUTION THIS APPLIANCE SHOULD NOT BE OPERATED WITH A CRACKED GLASS 8 CAUTION THIS APPLIANCE SHOULD BE MAINTAINED AND OPERATED AT ALL TIMES IN ACCORDANCE WITH THESE INSTRUCTIONS 9 CAUTION THE USE OF TREATED WOOD AS A FUEL CAN BE HAZARDOUS TO THE ENVIRONMENT AND DETRIMENTAL TO YOUR APPLIANCE Further Cautions Over Firing DO NOT run the Fairburn with the door ajar or open This w...

Страница 9: ...ooking surface and located below and forward of the flue flange collar This control is open in the east west position and allows the flue gases to travel directly up the flue and closed in the north south position diverting gases and heat down the firebox side of the oven across under the base of the oven up the other side across the top of the oven and then up the flue And two tools 1 The Poker S...

Страница 10: ...o heat up Never cook food directly on top of the top plates Always use pots pans and appropriate cooking implements When bringing pots to the boil or requiring high heat use top plates directly over the firebox Move cooking vessels further towards the oven side for slower cooking and lower heat A suitable raised trivet on the top can provide even slower cooking options Avoid spills which can be de...

Страница 11: ...st be replaced with a 5mm robax ceramic glass This should be purchased through your Wagener Stoves Dealer as the glass tape fitting is critical NOTE Do not operate your Fairburn with broken door glass and under no circumstance should a non ceramic type glass be used as it may explode due to the intense heat inside the fire box Door Seals Flue Flange and Secondary Air Tube The firebox door seal sho...

Страница 12: ...ves Lion Ltd reserves the right to change specifications or design of its products without prior notice WAGENER STOVES LION LTD 5 Allen Bell Drive KAITAIA NZ Phone Fax 09 408 2469 www wagenerstoves co nz 2017 2021 ...

Отзывы: