EN
91
AirConServiceCenter
Operation
4. Press
ENTER
to confirm both settings.
I
8.7.3
Filling process
1. Enter the preferred settings and press
ENTER
to confirm.
2. If
“Filling phase”
has been selected, enter the required value, oth-
erwise continue with chapter “Selecting connections” on page 92.
3. Enter the refrigerant oil quantity.
4. Press the cursor key
.
5. Enter the additive quantity.
6. Press the cursor key
.
7. Enter the refrigerant quantity.
8. Press
ENTER
to confirm all settings.
I
Vacuum time
min.
20
Leak Test
min.
4
ENTER-OK STOP-EXIT
NOTE
The air conditioning system is drained completely by the vacuum pump.
This is used to remove any remaining carrier gases or moisture, and to
prepare the air conditioning system for the filling process.
Filling phase?
Yes
No
ENTER-OK STOP-EXIT
PAG oil
ml.
5
UV tracer
ml.
7
Refrigerant
g.
500
ENTER-OK STOP-EXIT
NOTE
If extraction is taking place in the same process sequence, the
quantity of fresh oil is counted as an additional filling quantity, and is
added to the drained oil quantity extracted beforehand. If this value
is set to 0, exactly the quantity of oil which was extracted will be filled
again.
To add fresh oil or UV additive, a vacuum process must be per-
formed in the same process sequence. If no vacuum process has
been selected, only refrigerant can be selected in the filling menu.
Содержание ASC2300G
Страница 2: ......