P
AGE
42
M
AINTENANCE
C
HAPTER
5
S
YCON
2500
step 1
– step 2A – step 2B - step 3
annual maintenance in intervals of 6-12 month
requirements
time
app. 30 minutes
material :
indicator → page 27
depending on limit
maintenance set no.2
Art.nr. 33-090 028
cleaning set
Art.nr. 30-100 900
paper towels
tools
screw driver
cup or small bucket
cleaning set
prior to
S
WITCH OFF THE UNIT
maintenance
► press power switch off
M
AINTENANCE
S
TEPS
1
TO
3
refer to page 39
M
AINTENANCE
S
TEP
2B
C
HANGE
H
OSE
-P
IPES AND
O-
RINGS
The maintenance step 2B follows the maintenance
step 2A → page 40
orientate yourself on Figure 2.3 in page 15
→ Replace worn parts with the parts supplied with
the maintenance kit.
→ When fitting O-rings, roll the O-rings carefully
down to the first groove of the plug.
NOT
E