
SE RvICINg A ND INSPEC TION
145
W L 30
Inspection intervals
Maintenance and inspection personnel must have
specialized knowledge of servicing and inspection
work on the loader.
Follow the Operator’s Manual for the engine.
Perform the maintenance work listed in the inspec-
tion schedule depending on which interval has been
reached first, that is, if either the number of operat
-
ing hours have been reached or the time specified
in the schedule has elapsed.
At the end of the Operator’s Manual you will find the
form »Inspection verification«, in which the inspec
-
tions to be performed must be recorded.
Содержание WL 30
Страница 1: ...www wackerneuson com Operator s Manual Wheel Loader WL 30...
Страница 2: ...December 10 Edition...
Страница 17: ...BASIC INFORMATION 15 WL30...
Страница 48: ...TECHNICAL DATA 46 3 4 Dimensions Fig 11 Dimensions...
Страница 61: ...Description of the indicator warning and control elements 59 WL30...
Страница 126: ...Towing and transporting 124 Fig 58 Tying down the loader...
Страница 161: ...SERVICING AND INSPECTION 159 WL30 2 1 Fig 63 Cab tilt lever...
Страница 235: ...Appendix 233 WL30 For personal notes...
Страница 245: ...List of figures 243 WL30...