![Wacker Neuson VP 2050 Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/wacker-neuson/vp-2050/vp-2050_operators-manual_3334509024.webp)
Maintenance
VP 2050/W
wpm_tx001102gb.fm
22
4.4
Engine Oil
See Graphic: wc_gr000087
4.4.1
Drain oil while engine is still warm.
Note:
In the interests of environmental protection, place a plastic sheet
and a container under the machine to collect any liquid which drains
off. Dispose of this liquid in accordance with environmental protection
legislation
.
4.4.2
Remove the oil drain plug
(a)
.
4.4.3
Allow the oil to drain.
4.4.4
Install the drain plug.
4.4.5
Fill the engine crankcase through the oil filler opening
(b)
, to the upper
mark on the dipstick
(c)
. Do not thread in the dipstick to check the level.
See Technical Data
for oil quantity and type.
4.4.6
When the crankcase is full, reinstall the dipstick.
4.5
Adjusting the Engine Speed
See Graphic: wc_gr000280
Adjust to a full load speed of 3600 ± 100 rpm.
To adjust engine speed:
4.5.1
Place machine on a rubber test mat to prevent it from moving.
4.5.2
Start engine and allow it to warm up for a minute.
4.5.3
Turn throttle stop screw
(a)
in to increase speed, out to decrease
speed. Make sure throttle lever is touching stop screw before
measuring RPM.
NOTICE
:
Running plate at a speed higher than that listed in
Technical
Data
can damage both the plate and the engine.
wc_gr000087
c
b
a
wc_gr000280
a
Содержание VP 2050
Страница 1: ...Operator s Manual Vibroplate VP 2050 VP 2050W 500191658 005 0110 5 0 0 0 1 9 1 6 5 8...
Страница 10: ...Safety Information VP 2050 W wpm_si000312gb fm 8 1 5 Label Locations wpmgr005945...
Страница 16: ...Technical Data VP 2050 W wpm_td000321gb fm 14 2 4 Dimensions mm in 500 20 588 23 919 36 wpmgr005973...
Страница 32: ......
Страница 34: ......
Страница 36: ......