![Wacker Neuson VP 2050 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/wacker-neuson/vp-2050/vp-2050_operators-manual_3334509020.webp)
Maintenance
VP 2050/W
wpm_tx001102gb.fm
18
4.
Maintenance
4.1
Periodic Maintenance Schedule
4.1.1
Engine Maintenance
The chart below lists basic engine maintenance. Refer to the engine
manufacturer’s Operation Manual for additional information.
Daily
before
starting
After
first
20 hrs.
Every
2 weeks
or
50 hrs.
Every
month
or
100 hrs.
Every
year
or
300 hrs.
Check fuel level.
Check engine oil level.
Inspect fuel lines.
Inspect air filter. Replace as needed.
Clean air cleaner elements.
Change engine oil.
Clean engine cooling fins.
Clean sediment cup / fuel filter.
Check and clean spark plug.
Check and adjust valve clearance.
Change exciter oil.
Содержание VP 2050
Страница 1: ...Operator s Manual Vibroplate VP 2050 VP 2050W 500191658 005 0110 5 0 0 0 1 9 1 6 5 8...
Страница 10: ...Safety Information VP 2050 W wpm_si000312gb fm 8 1 5 Label Locations wpmgr005945...
Страница 16: ...Technical Data VP 2050 W wpm_td000321gb fm 14 2 4 Dimensions mm in 500 20 588 23 919 36 wpmgr005973...
Страница 32: ......
Страница 34: ......
Страница 36: ......