BA ET16 de* 1.0 * et16i400.fm
4-33
Putting into operation 4
Putting into operation for the first time and running-in period
Before putting the machine into operation for the first time, check whether
the equipment supplied with the machine is complete.
• Check the fluid levels according to chapter “
Maintenance
”.
Each machine is correctly adjusted and checked before it is delivered.
Handle the machine carefully during its first 50 operating hours.
• Do not load a cold engine.
• Warm up the machine at low engine speed and little load, do not warm
it up at a standstill.
• Do not change engine speed abruptly.
• Avoid using the machine under heavy loads or at high speeds.
• Avoid abrupt acceleration, braking and changing travel direction.
• Do not run the engine at high speed for extended periods.
• Observe the maintenance plans
– see chapter “7.2 Wartungsüber-
.
Содержание ET09-02
Страница 6: ...EG 2 BA ET16 de 1 0 et16konf fm Declaration of conformity Notes...
Страница 36: ...2 22 BA ET16 de 1 0 Safety_01_0 fm 2 Safety Notes...
Страница 45: ...BA ET16 de 1 0 et16e300 fm 3 9 Introduction 3 Warning labels...
Страница 49: ...BA ET16 de 1 0 et16e300 fm 3 13 Introduction 3 Labels...
Страница 54: ...3 18 BA ET16 de 1 0 et16e300 fm 3 Introduction ANSI label option...
Страница 84: ...4 24 BA ET16 de 1 0 et16i400 fm 4 Putting into operation Cabin overview 2 11 13 7 10 1 12 5 8 16 14 15 4 6 9 3...
Страница 102: ...4 42 BA ET16 de 1 0 et16i400 fm 4 Putting into operation Notes...
Страница 160: ...5 58 BA ET16 de 1 0 et16b510 fm 5 Operation Notes...
Страница 177: ...BA ET16 de 1 0 et16w700 fm 7 9 Maintenance 7 Lubrication plan 10 1 2 2 3 8 Fig 211 3 7 5 11 11 11 7 5 9 4 4 1 6...
Страница 218: ...8 4 BA ET16 de 1 0 et16b800 fm 8 Malfunctions Notes...
Страница 242: ...9 24 BA ET16 de 1 0 et16t900 fm 9 Technical data Notes...
Страница 246: ...S 4 BA ET16 de 1 0 et16en1_0SIX fm Index...