Operation
CRT 48-31V-ES
wc_tx000143gb.fm
22
4.8
Steering
See Graphic: wc_gr000688
Refer to the illustration for the necessary hand motions to move the
trowel in the desired direction, described below.
1
- forward
2
- reverse
3
- rotate clockwise
4
- rotate counter-clockwise
5
- left sideways
6
- right sideways
Содержание CRT 48-31V-ES
Страница 2: ......
Страница 10: ...Safety Information CRT 48 31V ES wc_si000050gb fm 8 2 5 Label Locations...
Страница 11: ...CRT 48 31V ES Safety Information wc_si000050gb fm 9...
Страница 33: ...CRT 48 31V ES Maintenance wc_tx000144gb fm 31...
Страница 40: ...Maintenance CRT 48 31V ES wc_tx000144gb fm 38 Notes...
Страница 41: ......
Страница 54: ...AEM_ConcretePowerTrowel qxd 7 23 03 6 31 AM Page 1...