OM 803 us – Edition 3.7 * 803b330.fm
3-49
Operation
Installing (up to the 2nd quarter of 2014)
1
Follow the safety instructions for assembly
2
Lower the boom to the ground.
3
Stop the engine
4
Raise the lock lever
Lock lever (up to serial no. AI00814)
Lock lever (from serial no. AI00815)
5
Remove the starting key
6
With the help of two persons, carefully slide shatter protection
A
from above into
the guide rails.
7
Secure the shatter protection on either side with two linch pins
B
.
Installing (from the 3rd quarter of 2014)
Perform steps 1 – 6 as described above.
☞
Secure the shatter protection with cross brace
C
and one split pin
D
on the left and right.
Removing
Remove in the reverse order.
Job site
Height of working area: 120 cm (47 in).
The figures refer to work with a Wacker Neuson hydraulic hammer.
Information!
Working with another attachment can modify the height of the working area.
Fig. 107: Installing the shatter protection (up to the 2nd
quarter of 2014)
A
B
Fig. 108: Installing the shatter protection (from the 3rd quar-
ter of 2014)
D
C
D
0°
120 cm
(47 in)
Fig. 109: Job site with shatter protection
Содержание 803 Dualpower
Страница 32: ...1 22 OM 803 us Edition 3 7 803b110 fm Introduction ...
Страница 50: ...2 18 OM 803 us Edition 3 7 803b210us fm Safety instructions Check track tension at regular intervals ...
Страница 54: ...2 22 OM 803 us Edition 3 7 803b210us fm Safety instructions ...
Страница 184: ...5 44 OM 803 us Edition 3 7 803b560 fm Maintenance ...
Страница 200: ...6 16 OM 803 us Edition 3 7 803b610 fm Technical data ...