Maintenance
PD
wc_tx000593gb.fm
22
4.
Maintenance
4.1
Periodic Maintenance Schedule
The chart below lists basic machine and engine maintenance. Refer to
the engine manufacturer’s Operator’s Manual for additional
information on engine maintenance.
Daily
before
starting
After
first
20 hrs.
Every 2
weeks
or 25
hrs.
Every
100
hrs.
Every
300
hrs.
Check fuel level.
•
Check engine oil level.
•
Inspect air filter. Replace as needed.
•
Check and tighten external hardware.
•
Change engine oil.
•
•
Check oil level in pump gear case.
•
Grease pump connecting rod bearing.
•
Clean sediment cup on engine fuel
system.
•
Check and clean spark plug.
•
Check and adjust valve clearance.
•
Change oil in pump gear case.
•
Содержание PDT 2
Страница 1: ...www wackergroup com Pump PDT 2 PDI 2 PDT 3 PDI 3 REPAIR MANUAL 0163153en 001 0606 0 1 6 3 1 5 3 E N...
Страница 2: ......
Страница 13: ...PD 2 3 Safety Information wc_si000176gb fm 9...
Страница 25: ...PD 2A 3A Operation wc_tx000592gb fm 21...
Страница 39: ...PD Repair Disassembly Assembly Procedures wc_tx000590gb fm 35 wc_gr003452 a b c h d d e f f g g e h...
Страница 41: ...PD Repair Disassembly Assembly Procedures wc_tx000590gb fm 37 wc_gr003453 a c b d e h h f g h A B C D e...
Страница 43: ...PD Repair Disassembly Assembly Procedures wc_tx000590gb fm 39 wc_gr003459 a a c e c g e d f b b d...
Страница 45: ...PD Repair Disassembly Assembly Procedures wc_tx000590gb fm 41 wc_gr003460 a c f b e d a g g...
Страница 49: ...PD Repair Disassembly Assembly Procedures wc_tx000590gb fm 45 wc_gr003461 a c d e b b f h j k l m i n...
Страница 51: ...PD Repair Disassembly Assembly Procedures wc_tx000590gb fm 47 wc_gr003463 a c d e b f h k k l m i n...
Страница 53: ...PD Repair Disassembly Assembly Procedures wc_tx000590gb fm 49 wc_gr003465 wc_gr003464...
Страница 54: ...Disassembly Assembly Procedures PD Repair wc_tx000590gb fm 50...
Страница 59: ......