background image

1A

OPERATION

HMS

1A-6

1.6

Application

The HMS series of internal vibrators can be used over  a
wide range of applications for the consolidation of con-
crete.

WACKER internal vibrators are typically used for on-site
vibration of concrete for foundations, walls, columns,
slab work, etc. Additional in-plant applications include
vibration of concrete during the production of pipes,
slabs, beams, double T columns, walls, etc.

Acceptable Combinations

Not Recommended - On small diameter shafts, motor may overspeed shaft and head. On long shafts, motor may overload.

Not compatible

a

b

c

1007SD34

1.7

Recommended HMS Combinations

)

b

(

s

t

f

a

h

S

E

-

1

M

S

E

-

2

M

S

E

-

4

M

S

S

-

0

M

S

S

-

1

M

S

S

-

2

M

S

S

-

3

M

S

S

-

4

M

S

S

-

5

M

S

S

-

7

M

S

S

-

9

M

S

h

t

g

n

e

L

)

m

(

.

t

f

)

1

(

3

)

2

(

5

.

6

)

4

(

3

1

)

5

.

0

(

5

.

1

)

1

(

3

)

2

(

5

.

6

)

3

(

0

1

)

4

(

3

1

)

5

(

5

.

6

1

)

7

(

3

2

)

9

(

5

.

9

2

)

c

(

d

a

e

H

)

a

(

r

o

t

o

M

5

2

H

0

0

0

1

M

x

x

x

x

x

x

x

x

0

0

0

2

M

x

x

x

x

x

x

x

x

0

0

0

3

M

x

x

x

x

x

x

x

x

5

3

H

0

0

0

1

M

x

x

x

0

0

0

2

M

x

x

x

0

0

0

3

M

x

x

x

5

4

H

0

0

0

2

M

x

x

x

0

0

0

3

M

x

x

x

5

5

H

0

0

0

2

M

x

x

x

0

0

0

3

M

x

x

x

5

6

H

0

0

0

2

M

x

x

x

0

0

0

3

M

x

x

x

The HMS Sytem has three basic parts:

(a)

motor

(b)

shaft

(c)

head

These three pieces can be assembled in various combi-
nations to meet job requirements. Choosing the correct
combination is important to produce good results and
protect the parts from excessive wear and damage.
Selecting too large a head/shaft combination will over-
load the motor.

Refer to Table 1 below when selecting motor, shaft, and
head combinations.

Table 1 Recommended HMS Combinations

x

Содержание M 1000

Страница 1: ...www wackergroup com Internal Vibrator M 1000 M 2000 M 3000 OPERATOR S MANUAL 0154561en 001 0403 0 1 5 4 5 6 1 E N...

Страница 2: ......

Страница 3: ...rating instructions carefully If you have questions about operating or servicing this equipment please contact Wacker Corporation The information contained in this manual was based on machines in prod...

Страница 4: ...ion und Maschinen Nummer ist an jedem Ger t angebracht Die Daten von diesem Schild bitte notieren damit sie auch bei Verlust oder Besch digung des Schildes noch vorhanden sind DerTyp dieArtikel Nummer...

Страница 5: ...6 1 7 Recommended HMS Combinations 1A 6 1 8 Extension Cords 1A 7 1 9 Connecting Motor to Power Supply 1A 7 1 10 Assembling Head Motor and Shaft 1A 8 1 11 Operation 1A 8 1 12 Periodic Maintenance 1A 9...

Страница 6: ...dditional information important to a procedure This is the safety alert symbol It is used to alert you to potential personal injury hazards Obey all safety messages that follow this symbol to avoid po...

Страница 7: ...it is connected to power source Don t carry motor with finger on switch Stay alert Watch what you are doing Use common sense Do not operate tool when you are tired Do not operate equipment if switch d...

Страница 8: ...WACKER P N 27238 Sound and Vibration Measurements The required sound specifications per Appendix 1 Paragraph 1 7 4 f of the EC Machine Regulations are the sound pressure level at operator s location...

Страница 9: ...OPERACION SEGURA LEA MANUAL DE OPERACION CAUTION VORSICHT PRECAUTION PRECAUCION 1039SD19 78071 16 1 5 Label Locations 1 4 Safety Informational Labels This WACKER machine uses international pictorial l...

Страница 10: ...S S 2 M S S 3 M S S 4 M S S 5 M S S 7 M S S 9 M S h t g n e L m t f 1 3 2 5 6 4 3 1 5 0 5 1 1 3 2 5 6 3 0 1 4 3 1 5 5 6 1 7 3 2 9 5 9 2 c d a e H a r o t o M 5 2 H 0 0 0 1 M x x x x x x x x 0 0 0 2 M...

Страница 11: ...Toreducetheriskofelectricshock motorsequipped with3 wiregroundedplugsmustbeproperlyground ed Onthesemotorsuseonly3 wiregroundedplugs receptacles and extension cords 1 9 Connecting Motor to Power Supp...

Страница 12: ...cause the bearings to overheat For more detailed information on the use selec tion and application of WACKER equipment for concreteconsolidation orderWackerpublication WCW 982 CONCRETE CONSOLIDATION 1...

Страница 13: ...otor Remove filter e and wash in warm soapy water Allow filter to dry completely before using 1 13 Motor Brushes To protect the motor the brushes are designed to auto maticallyshutoffthemotoriftheybec...

Страница 14: ...ting Head The bearings in the head are lubricated with oil To extend bearing life change oil in head every 300 hours of operation To change oil Place head in a vise and remove tip from casing If neces...

Страница 15: ...supply 2 Brushes are worn too short Replace 3 Switch on motor bad or wire connections loose Motor runs at normal speed 1 Air filter screen or vents clogged blocking air flow but overheats 2 Too much...

Страница 16: ...BRUSH 5 RH BRUSH 6 RFI CAPACITOR 7 INDUCTION COIL B BLACK or BROWN G GREEN or GREEN W YELLOW STRIPE Y YELLOW W WHITE or BLUE 1 SWITCH 2 STATOR 3 ROTOR 4 LH BRUSH 5 RH BRUSH 6 RFI CAPACITOR 7 INDUCTION...

Страница 17: ...ordance with the following standards in bereinstimmung mit folgenden Richtlinien hergestellt worden ist ha sido fabricado en conformidad con las siguientes normas est produit conforme aux dispositions...

Страница 18: ......

Отзывы: