TROWEL REPAIR
GUIDE HANDLE
2
2-5
Assembly:
1. Place control cable terminal
(k)
into Twist Control
assembly
(j)
. Drive roll pin
(h)
into assembly.
2. Lubricate threads on Twist Control assembly. Slide
cable down into handle. Turn twist control assembly
fully counterclockwise.
3. Place Twist Control assembly into handle, lining up
holes in handle. Attach M6 screw
(m)
to the underneath
of handle.
4. Apply Loctite 243 or equivalent to threads of M6 screw
(g)
. Attach to top of handle. Torque to 6 ft.lbs. (8 Nm).
5. Thread cable through handle base
(b)
and over pulley
(c)
. Slide handle into base.
6. Apply Loctite 243 or equivalent and attach two
M8 screws
(a)
to handle. Torque to 16 ft.lbs. (22 Nm).
7. Thread control cable fork
(e)
and attach retaining nuts
(f)
. Adjust cable nuts until cable is snug and trowel
blades lay flat (0
o
pitch).
Содержание CT 30 Series
Страница 2: ......
Страница 26: ...3 6 3 CLUTCH TROWEL REPAIR Notes...
Страница 30: ...4 4 4 SPIDER TROWEL REPAIR Notes...
Страница 38: ...5 8 5 DRIVETRAIN TROWEL REPAIR Notes...
Страница 40: ...6 2 6 TROWEL REPAIR TROUBLESHOOTING Notes...
Страница 43: ......