Small Diameter Beveler: Maintenance
E.H. Wachs
Part No. 56-MAN-01, Rev. B 47
M
aintenance
Under normal operating conditions, the bevel gear sets and roller bearing should be inspected
every 100 hours of operation and lubricated as needed. If exceptionally difficult work has been
performed or if excessive coolant has contaminated the gear sets and roller bearings, inspection
should be done much more frequently.
The bore of the cutting head, feed nut and mandrel must be kept cleaned and oiled.
Main Shaft Bearing Pre-Load
lock nut tool required
After the first ten hours of operation, the mainshaft bearing preload should be checked. Remove
the air motor. Remove the 4 1/4-20 x 2 1/2 SHCS to remove feed nut housing (56-002-00). Bend
the lock washer (56-034-00) tab clear from the locknut (56-033-00). Insert and tighten an old, used
tool bit into one of the slots on the cutting head. Clamp machine into a bench vise. Using the lock
nut tool and a torque wrench, tighten locknut to 50 ft. lbs. while rotating the main housing. Once
tight, secure lock washer tang into the closest locknut slot. Replace feed nut housing and fasteners,
replace and secure air motor.
After every ten hours of operations, inspect the mandrel guide bushing for wear. Replace as
necessary.
notE
Excessive chatter may indicate a worn mandrel guide Bushing.
After 40 hours of operation, flush the air motor with a solution of three parts cleaning solvent and
one part air motor oil. After flushing, add 1 oz. (30 cc) air motor oil into air line and run air motor
for one minute. It is very important that the components of the mandrel assembly remain clean and
free from corrosion. The legs and machine surfaces should be cleaned and oiled on a daily basis.
Содержание SDB 206
Страница 10: ...SDB 206 and FF 313 8 Part No 56 MAN 01 Rev B E H Wachs...
Страница 11: ...Introduction to the Equipment E H Wachs Part No 56 MAN 01 Rev B 9 SDB 206 Air Drive 56 000 01 DETAIL A NOTE...
Страница 12: ...SDB 206 and FF 313 10 Part No 56 MAN 01 Rev B E H Wachs SDB 206 Electric Drive 56 000 02 NOTE...
Страница 13: ...Introduction to the Equipment E H Wachs Part No 56 MAN 01 Rev B 11 SDB 206 Hydraulic Drive 56 000 03 NOTE...
Страница 18: ...SDB 206 and FF 313 16 Part No 56 MAN 01 Rev B E H Wachs...
Страница 26: ...SDB 206 and FF 313 24 Part No 56 MAN 01 Rev B E H Wachs...
Страница 75: ......