12
2.
Delivery and set up
2.1
Transporting the machine
We recommend two people to lift the machine, using the positions shown (1).
To do this, a sufficiently dimensioned, at least Ø 20 mm steel rod is pushed through the main spindle.
The machine should be carried and balanced by one person at the steel rod and by the other person,
at the shown position on the opposite underside of the bed.
Due to the weight of the machine it is advisable to lift the machine by crane, if this is possible. To lift,
wrap suitable lashing (2) as shown around the two outer struts of the ribbing of the machine bed.
When lifting, pay attention to an ergonomic stance and sufficient safety!
In the delivered state, the machine feet have two transport straps attached. These secure the
machine to the transportation pallet. They must be removed before setting the machine up.
Содержание D4000
Страница 42: ...42 18 Drawings and legends 18 5 Headstock Tumbler gear...
Страница 44: ...44 18 Drawings and legends 18 6 Bed with lead screw...
Страница 46: ...46 18 Drawings and legends 18 7 Change gear quadrant...
Страница 48: ...48 18 Drawings and legends 18 8 Tool skid Transverse skid...
Страница 50: ...50 18 Drawings and legends 18 9 Tool skid Lock plate...
Страница 52: ...52 18 Drawings and legends 18 10 Tool skid Longitudinal skid...
Страница 54: ...54 18 Drawings and legends 18 11 Tailstock...
Страница 73: ...73 23 Tensioning bracket with milling machine table optional 23 7 Drawing and legend...