![WABCO OPTIFLOW SIDEWINGS Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/wabco/optiflow-sidewings/optiflow-sidewings_installation-manual_3106733029.webp)
OptiFlow™ SideWings
Installation
When everything is fi tted, all joints must be in the middle of the clamping
When everything is fi tted, all joints must be in the middle of the clamping
unit.
unit.
– When all skirts are mounted, tighten the nuts (I and II) on the clamping
units (SW13, M8, 24Nm).
M8, 24Nm).
I
II
–
– When one side of the trailer is fi nished, repeat the procedure with the
When one side of the trailer is fi nished, repeat the procedure with the
EndSkirt on the other side.
EndSkirt on the other side.
1
2
3
4
I
II
Содержание OPTIFLOW SIDEWINGS
Страница 1: ...OPTIFLOWTM SIDEWINGS INSTALLATION MANUAL...
Страница 32: ...32 OptiFlow SideWings Installation Undo the screws on the slider Remove the slider...
Страница 45: ...45 OptiFlow SideWings Operation 7 Operation 7 1 Hatches Opening Press the first knob...
Страница 48: ...48 OptiFlow SideWings Operation 7 3 Hinged Pillars Pull out the safety pin...
Страница 54: ...54 OptiFlow SideWings Appendix 10 2 Example of SideWings Positioning drawing...