Page 17
IMPORTANT! YOU MUST RUN THE CHECK SWITCH AFTER SWITCHING TRIOS!
IMPORTANT! YOU MUST RUN THE CHECK SWITCH AFTER SWITCHING TRIOS!
61, 110, 119 TRIO (DISH 1000a)
1. On the VuQube controller, press and release the ON button.
Wait for the status light to flash orange, and then flash
green or red.
2. Press and release the ON button
4
times.
The status light starts rapidly flashing green and red.
3. Press and hold the button for 4 seconds.
The status light will turn orange for 1 second, and then start flashing
green or red.
4. Press OFF.
GO TO PAGE 12 AND RUN THE CHECK SWITCH.
110, 119, 129 TRIO (DISH 1000)
1. On the VuQube controller, press and release the ON button.
Wait for the status light to flash orange, and then flash
green or red.
2. Press and release the ON button
4
times.
The status light starts rapidly flashing green and red.
3. Press and hold the button for 4 seconds.
The status light will turn orange for 1 second, and then start flashing
green or red.
4. Press OFF.
GO TO PAGE 12 AND RUN THE CHECK SWITCH.
Содержание VQ2000
Страница 2: ......
Страница 13: ...This page intentionally left blank Page 11...
Страница 24: ...Page 22 SECTION 6 SECURITY BRACKET The VuQube can be secured to an object using a padlock and cable Fig 5 Fig 5...
Страница 27: ......
Страница 28: ...11200 Hampshire Avenue South Bloomington MN 55438 2453 Phone 800 982 9920 Fax 952 922 8424 www kingcontrols com...