background image

– 6 –

VENT HOOD

Some local codes may require the steamer to be located under an exhaust hood. Information on the
construction and installation of ventilating hoods may be obtained from

 NFPA Standard No. 96, Vapor

Removal from Cooking Equipment (latest edition).

STARTUP TEST

WARNING: THE STEAMER AND ITS PARTS ARE HOT. USE CARE WHEN OPERATING,
CLEANING OR SERVICING THE STEAMER. THE COOKING COMPARTMENT CONTAINS LIVE
STEAM. STAY CLEAR WHILE OPENING THE DOOR.

Once the steamer is installed and all mechanical connections have been made, thoroughly test the
steamer before operation.

1. Check that proper water, drain and electrical connections have been made.

2. Turn main power switch on. After approximately 15 minutes, the Ready Light should come on,

indicating that the water temperature is 205°F (96°C).

3. When the Ready Light comes on, set the timer at 5 minutes. With door open, observe that no steam

is entering the compartment and the Cooking Light is off.

4. Close compartment door. The Cooking Light should now be lit, and steam should be heard

entering the compartment after about 45 seconds (5 minutes if boiler is empty).

5. Check drain line to make sure that water from the cold water condenser is flowing through the

drain line.

6. Open compartment door and observe that steam supply to the chamber is cut off. (Ready Light

should again come on, and Cooking Light goes off.)

7. Close compartment door and let cooking cycle finish. When the timer returns to the "0" position,

a buzzer will sound, signalling the end of the cooking cycle. To silence the buzzer, turn the dial
timer to off.

8. Complete the above steps for each cooking compartment.

9. To shut the steamer down, turn the main power switch off and leave the compartment doors

slightly open to allow the inside to dry out.

Содержание VSX10EC ML-114824

Страница 1: ...formation on Vulcan Hart Company or to locate an authorized parts and service provider in your area visit our website at www vulcanhart com VSX7 VSX10 SERIES ELECTRIC CONVECTION STEAMERS MODELS VSX7EC...

Страница 2: ...Vent Hood 6 Startup Test 6 Installation Drawings 7 OPERATION 8 Controls 8 Main Power Switch 8 Before First Use 8 Preheat 9 Cook 9 Shutdown 9 Cooking Hints 9 Preparation 9 Frozen Food Items 9 Draining...

Страница 3: ...y read this entire manual and carefully follow all of the instructions provided INSTALLATION UNPACKING This steamer was inspected before leaving the factory The transportation company assumes full res...

Страница 4: ...loor Insert proper anchoring devices Set steamer back in proper position Install bolts through anchoring holes and into anchors to secure the steamer to the floor Seal bolts and flanged feet with Sila...

Страница 5: ...e of the food prepared in the steamer reduce liming in the steam generator and extend equipment life Local water conditions vary from one location to another Ask your municipal water supplier for deta...

Страница 6: ...205 F 96 C 3 When the Ready Light comes on set the timer at 5 minutes With door open observe that no steam is entering the compartment and the Cooking Light is off 4 Close compartment door The Cooking...

Страница 7: ...7 INSTALLATION DRAWINGS Cabinet Base Open Base...

Страница 8: ...ed if the door is opened during the cooking cycle resume cooking by closing the door When done a buzzer sounds and steam supply to the cooking chamber will cease Turn the timer off to stop the buzzer...

Страница 9: ...t food holding time to a minimum to produce the most appetizing results Prepare small batches cook only enough to start serving and then cook additional amounts to meet demand PREPARATION Prepare vege...

Страница 10: ...3 doz Fresh Cherrystone 5 to 6 3 doz King Crab frozen Claws 4 21 2 lb Legs 4 to 6 41 2 lb Shrimp frozen 10 per lb 5 4 lb Lobster Tail frozen 6 10 lb Lobster Live 10 to 12 5 4 per pan Scallops fresh 4...

Страница 11: ...l wool or abrasive scouring pads as they will scratch and ruin the general surface appearance of the steamer Use warm soapy water with a cloth or sponge to clean the exposed bead of the door gasket Ri...

Страница 12: ...PRINTED IN U S A MAINTENANCE WARNING THE STEAMER AND ITS PARTS ARE HOT USE CARE WHEN OPERATING CLEANING OR SERVICING THE STEAMER COMPARTMENTS CONTAIN LIVE STEAM STAY CLEAR WHEN OPENING DOOR S WARNING...

Отзывы: