Group 30 Electrical System—VNL, VNM
Service Procedures
6
W3001007
1) Spacers
Install the fuse panel with 3 torx bolts.
Align the 2 plastic spacers with 2 bolts
through the spacers, taking care to
route the wires so that none are
caught between the spacers and
mounting brackets, or between the
spacers and fuse panel. Torque to
4.5 ± 0.5 Nm (40 ± 5 in-lb).
7
W3000794
Reach through the ashtray opening to
install the lower fuse panel bolt.
Torque to 4.5 ± 0.5 Nm (40 ± 5 in-lb).
8
Install the ashtray housing and ash-
tray. Torque ashtray mounting screws
to 0.4 ± 0.1 Nm (3.5 ± 1 in-lb).
9
Install the fuse panel cover and the
top TEC panel cover. Torque screws
to 2.5 ± 0.5 Nm (22 ± 5 in-lb).
10
Connect the battery cables, positive
side first. Torque nuts to 20.3–24.4
Nm (15–18 ft–lb).
78
Содержание VNL
Страница 1: ...Service Manual Trucks Group 30 New Features Electrical General VNL VNM PV776 TSP23760 1 ...
Страница 4: ...2 ...
Страница 6: ...4 ...
Страница 8: ...6 ...
Страница 22: ...Group 30 Electrical System VNL VNM Design and Function Starting and Charging System Logic Diagram W3000772 20 ...
Страница 44: ...42 ...
Страница 98: ......
Страница 99: ......