Group 72
Service Procedures
10
Using a lift or overhead crane, install the remaining
leaf springs.
Note: Be sure that all leaf springs are properly aligned
and that all shims are installed properly.
Note: When replacing Parabolic Spring Leaves, the
leaves on both sides should be replaced. When replacing
the leaves, also insure that the leaves are marked with
the same Camber Settings (+ or
0
).
11
Install the saddle cap and U-bolt nuts. Torque the U-bolt
nuts to 500 ± 75 Nm. Torque all U-bolt nuts to 10 Nm
before applying the full amount of torque.
500 ± 75 Nm (369 ± 55 ft-lb)
12
Raise the frame and remove the jack stands, then lower
the frame and remove the wheel chocks.
32
Содержание Group 655-601
Страница 1: ...Service Manual Trucks Group 655 601 Rear Suspension T Ride VN VHD PV776 TSP142921 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...2 ...
Страница 8: ...4 ...
Страница 12: ...8 ...
Страница 19: ...Group 72 Design and Function W6001328 Bogie Bracket and Cradle Assembly 15 ...
Страница 22: ...18 ...
Страница 53: ...49 ...