d) Cancelling the measurement process early
•
Briefly press the
button (4) so that the
currently set time period is shown on the dis-
play.
• Press and hold the
button (4) for 3 sec-
onds until the normal indicator appears on the
display.
•
Once the flashing “PERIOD” indicator has dis
-
appeared, the measurement process has been
cancelled.
e) Viewing saved measurement processes
The energy cost meter saves data for the last 3 measurement processes.
The following functions are only possible if a measurement process has
previously been ended correctly.
•
Briefly pressing the
button (6) several times allows you to select the
measurement process that you want to view. The respective duration is dis-
played in the upper row.
•
Briefly press the
button (7) several times to view the data (lower display
row: “ENERGY” = energy in kWh, “COST” = costs, “CO
2
” = CO
2
value).
64