
a. Pre-arrange the AC bus at a suitable location to connect the Microinverter.
b. When there is an LCF filter, connect one end of the AC bus to the same side of the filter as
the EMU connection; when there is no LCF filter, the AC bus should be connected to the grid
connection equipment such as a combiner box or outlet .
Pay attention to the wiring method of the AC bus, it should be one of the types 1/2/3/4
Type 1. Live (L) - Red; Neutral (N) - Black; Earth (PE) - Green.
Type 2. Live (L) - Red; Neutral (N) - Black; Earth (PE) - Blue.
Type 3. Live (L) - Brown; Neutral (N) - Blue; Earth (PE) - Yellow Green.
Type 4. Live (L) - Black; Neutral (N) - Blue; Earth (PE) - Yellow Green.
Step 3: Install the AC Bus
Step 4: Install the
VOLTACON
Microinverter on the Bracket or the Frame of the Solar
Module
c 2022 BENY Electric Inc.