Pro
te
cte
d b
y c
op
yri
gh
t. C
op
yi
ng
fo
r p
riv
at
e
o
r c
o
m
m
e
rc
ia
l p
u
rp
o
s
e
s
, i
n
p
a
rt
o
r i
n
w
h
o
le
, i
s
n
o
t p
e
rm
itt
ed
u
nl
es
s a
ut
ho
ris
ed
by
Vo
lksw
agen
AG. Volkswagen AG doe
s not
gua
ran
tee
or a
cc
ep
t a
ny
lia
b
ilit
y w
ith
re
s
p
e
c
t t
o
th
e
c
o
rr
e
c
tn
e
s
s
o
f
in
fo
rm
a
tio
n
in
th
is
d
oc
um
en
t.
C
op
yrig
ht b
y V
olk
sw
age
n A
G.
Idle speed rotation measurement and content of CO:
It automatically switches to the indication of idle speed rotation
measurement and content of CO.
The measurement starts as soon as the engine rotation reaches
the necessary level.
The remaining time for performing the measurement is indicated
on the space -arrow A-.
Probe inspection test:
Note
The probe inspection test is not performed when all readiness
code values are at zero.
It switches automatically to the probe inspection test indication.
Note
The probe inspection test is performed individually for each Lamb‐
da Probe .
The measurement starts as soon as the engine rotation reaches
the necessary level.
– Keep the engine rotation on the necessary level.
The remaining time for performing the measurement is indicated
on the space -arrow A-.
Assessment:
After the exhaust gas test, the report will be displayed on the
screen.
The test result is indicated.
In this location, remarks about the exhaust gas test can be en‐
tered -arrow A-. They are included on the test report.
– After successfully performing the exhaust gas test, select on
the hanging menu - arrow B - “Assigned exhaust gas test plate”
and the date.
– Confirm with “Yes” - arrow C -.
– Then, press it.
FOX 2004 ➤
Maintenance - Edition 07.2010
106
5. Additional tasks due to country legislation