
Page 12
UG10555-2.0 - Tri Motion User Guide V2.0
5 Mounting
Tools required
• 19 mm ratchet spanner/wrench
• 6 mm Allen key
5.1 Installation safety
To avoid mechanical hazards, please note the following:
• Safety regulations vary in different regions. Full compliance with those
regulations must be your priority
• Rigging must only be undertaken by fully-qualified and experienced riggers who
understand local regulations
• This may include consulting a structural engineer before installation of wall brackets
• Remember that all personnel have a duty of care to themselves, to their assistants, to
the venue staff and to the public
• Before lifting any part of the system above head height, check the whole rig for loose
tools or other items that may fall and cause injury
• Do not use a telephone (even if hands-free) while rigging. Always concentrate fully on
the rigging operation
• Do not rig equipment that is worn, damaged, corroded, mishandled or over-stressed in any
way
• Use only Void-approved mounting equipment and accessories
• Secondary safeties should be provided in all instances where cabinets are flying or fixing
overhead and should conform to local regulations