P24A & P34A Service Manual
7-5
MAINTENANCE
12/17/2012
To clean the water tank:
1. Stop the machine at the end of harvest.
2. Shut off the make-up water supply.
3. Open the drain valve and drain the tank.
4. Remove the water box cover and flush out any loose sediment from the tank. The wire mesh
screen can be removed if necessary.
5. If further cleaning is needed, follow “Cleaning Procedure”.
6. If further cleaning is not needed, close the drain valve and refill the tank with fresh water.
7. Make sure the float valve is adjusted properly and install the water box cover.
8. Start and stop the pump again to make sure it is circulating water and is not air bound.
Water Cooled Condenser Cleaning.
As water evaporates from a cooling tower, the solid
impurities remain and must be flushed from the system to prevent a scale build-up in the condenser
and cooling tower. This can be accomplished by a continuous bleed off valve located in the pump
discharge line. The valve should be adjusted to bleed off an equal amount of water which is
evaporated. If water hardness is very high, a higher bleed off rate or chemical treatment may be
required. Consult your local water treatment company for recommendations.
If after a period of time, scale has formed inside the tubes, mechanical cleaning may be necessary.
See “Servicing Section--Condenser”.
Cooling Tower/Evap Condenser.
See Figure 3-7 for parts location.
1. Bleed off valve. The bleed off valve should be checked monthly to assure that is not blocked and
that water is flowing as required. If the unit is controlled by a water treatment system, the bleed
off valve may not be required.
2. Strainer. The pan or sump strainer is located in the bottom of the sump at the suction connection
to the pump. The strainer should be inspected monthly and kept clean. Do not operate the unit
without the strainer in place.
3. Make-up water float valve. This valve should be checked monthly for proper operation and
adjustment. It should be adjusted to maintain a water level below the overflow and high enough
to prevent the pump from cavitating when the system is in operation.
4. Spray nozzles. The spray nozzles should be checked monthly to make sure none are restricted
and the spray pattern is complete and even.
5. Pump motor and fan motor. The motors should be checked and/or lubricated every six months
according to the motor manufacturer’s recommendations.
6. Fan bearings. The fan bearings should be lubricated every six months. Make sure the proper
grade of grease is used (normally conforms to NLCI-Grade 2) and it is best to use a hand grease
gun.
7. Fan belts. The fan belt tension should be checked weekly for the first two weeks of operation,
then monthly during continuous use.
The best tension for a V-belt is the lowest tension at which the belt will not slip under its full load.
Never use dressing on V-belts. Keep belts and grooves clean and free of oil, grease, and foreign
material. Clean with non-flammable, non-toxic degreasing agent or commercial detergent and water.
! CAUTION !
Follow all lock-out and tag-out procedures before servicing any electrical equipment.
! CAUTION !
Содержание TUBE-ICE P-24A
Страница 1: ...12 20 12 P 24A P 34A TUBE ICE MACHINE Service Manual 5000 ...
Страница 4: ...12 20 12 ...
Страница 6: ...12 20 12 ...
Страница 12: ...12 20 12 ...
Страница 16: ...P24A P34A Service Manual INTRODUCTION 12 18 12 1 4 FIGURE 1 1 P24A Front Side Control Panel ...
Страница 17: ...P24A P34A Service Manual INTRODUCTION 12 18 12 1 5 FIGURE 1 2 P24A Right Side ...
Страница 18: ...P24A P34A Service Manual INTRODUCTION 12 18 12 1 6 FIGURE 1 3 P24A Back Side ...
Страница 19: ...P24A P34A Service Manual INTRODUCTION 12 18 12 1 7 FIGURE 1 4 P24A Left Side ...
Страница 20: ...P24A P34A Service Manual INTRODUCTION 12 18 12 1 8 FIGURE 1 5 P34A Front Side ...
Страница 21: ...P24A P34A Service Manual INTRODUCTION 12 18 12 1 9 FIGURE 1 6 P34A Right Side ...
Страница 22: ...P24A P34A Service Manual INTRODUCTION 12 18 12 1 10 FIGURE 1 7 P34A Back Side ...
Страница 23: ...P24A P34A Service Manual INTRODUCTION 12 18 12 1 11 FIGURE 1 8 P34A Left Side Control Panel ...
Страница 24: ...P24A P34A Service Manual INTRODUCTION 12 18 12 1 12 FIGURE 1 9 P24A Compressor Diagram ...
Страница 28: ...P24A P34A Service Manual RECEIPT OF YOUR TUBE ICE MACHINE 12 26 12 2 4 ...
Страница 32: ...P24A P34A Service Manual INSTALLING YOUR TUBE ICE MACHINE 12 20 12 3 4 FIGURE 3 2 P24A Foundation Layout ...
Страница 35: ...P24A P34A Service Manual INSTALLING YOUR TUBE ICE MACHINE 12 20 12 3 7 FIGURE 3 4 P34A Foundation Layout ...
Страница 36: ...P24A P34A Service Manual INSTALLING YOUR TUBE ICE MACHINE 12 20 12 3 8 FIGURE 3 5 Lifting Procedure for P24A ...
Страница 37: ...P24A P34A Service Manual INSTALLING YOUR TUBE ICE MACHINE 12 20 12 3 9 FIGURE 3 6 Lifting Procedure for P34A ...
Страница 49: ...P24A P34A Service Manual HOW YOUR TUBE ICE MACHINE WORKS 8 25 05 4 3 FIGURE 4 1 Piping Schematic for P24A ...
Страница 50: ...P24A P34A Service Manual HOW YOUR TUBE ICE MACHINE WORKS 8 25 05 4 4 FIGURE 4 2 Piping Schematic for P34A ...
Страница 64: ...P24A P34A Service Manual ELECTRICAL CONTROLS 12 17 12 6 8 FIGURE 6 7 Allen Bradley Soft Start Motor Wiring ...
Страница 99: ...P24A P34A Service Manual SERVICING OPERATIONS 12 18 12 9 13 Figure 9 5B P24A Water Tank Assembly ...
Страница 115: ...P24A P34A Service Manual TABLES CHARTS 12 18 12 11 1 11 Tables Charts ...
Страница 125: ...Appendix A ...
Страница 128: ......
Страница 130: ...i ...
Страница 131: ...ii ...
Страница 132: ...1 ...
Страница 133: ...2 ...
Страница 134: ...3 ...
Страница 135: ...4 ...
Страница 136: ...5 ...
Страница 137: ...6 ...
Страница 138: ...7 ...
Страница 139: ...8 ...
Страница 140: ...9 ...
Страница 141: ...10 ...
Страница 142: ...1 ...
Страница 146: ...P24A P34A Service Manual INDEX 12 26 12 12 4 ...