Page 4
/ PB65XL
Vogelzang International Corp.
VGZ-003 / 20120327.0
TOOLS
REQUIRED
CAUTION: STOVE IS HEAVY. MAKE SURE YOU
HAVE ADEQUATE HELP AND USE PROPER
LIFTING TECHNIQUES WHENEVER MOVING
STOVE.
Refer to diagram and parts lists at back of this manual.
1. Uncrate the stove and remove all protective packing
materials and protective poly bag. (Save cardboard
carton for further assembly.)
2. Remove par ts from inside of stove. Par ts
include: one lid (#1), one lid lifter (#2), one ash door
(#16) with one slide draft (#17), one ash drawer
(#19), four legs (#15), hardware pack (#21), draft
damper (#20), and one Spring Handle (#9) from
inside the firebox.
3. Place flattened carton on floor and carefully turn
stove over onto carton.
4. Securely attach all four legs to base of stove with
stove bolts.
5. Carefully lift stove upright and place in desired
location (see following instructions for properly
locating stove from combustible materials).
6. Place lid (#1) in position on top plate.
7. Place ash drawer (#19) into lower chamber (#13).
Position ash door (#16) with slide draft (#17) on
front of lower chamber (#13).
8. Place shaker grate (#12) in lower chamber.
ASSEMBLY INSTRUCTIONS
MATERIALS
REQUIRED
(NOTE: The following items are NOT included with your stove)
9. Install flue pipe
draft damper
(#20) into the top
end of the first straight section of stove pipe (fig.1)
exiting the stove
before
the stove is used.
a. Drill two 1/4” holes centered on either side of the
pipe section 6” from the top end of the pipe (figure
1).
b. Remove the handle from the damper then slide the
damper into the pipe.
c. Align the damper with the holes drilled in step 9a
and insert the handle through the holes and the
damper.
NOTE: THIS DAMPER IS NECESSARY FOR THE
PROPER OPERATION OF THE STOVE AND
TO MEET EPA EMISSIONS REQUIREMENTS
FOR HEATING APPLIANCES. IT MUST BE IN-
STALLED BEFORE USE. (NO EXCEPTIONS)
10. Attach stove piping — see instructions on page 5.
1/8” dia. Drill Bit
(sheet metal screws)
Phillips Style Screwdriver
14mm Nut Driver or Ratchet
with 14mm Socket (for 14mm
Hex Nuts & Stove Bolts)
Safety Glasses
Hearth Gloves
Pencil
6 foot Folding Rule or
Tape Measure
Tin Snips
Drill: Hand or Electric
Flooring Protection: 54” x 63”
min. as specified (see page 4)
Chimney Connection: 6” black
steel (24 ga. min.) straight or
elbow (as required)
1/2” Sheet Metal Screws
Chimney: Existing 6” Lined Ma-
sonry Chimney or 6” Inside Dia.
manufactured chimney system
listed to UL 103 HT.
Furnace Cement (manufacturer
recommends Rutland Code 78
or equivalent)
6"/15.25 cm
DRAFT DAMPER
(must be installed
before use — NO
EXCEPTIONS!)
NOTICE: Vogelzang International Corp. grants no warranty, stated or implied, for the installation or maintenance of
your wood stove and assumes no responsibility of any incidental or consequential damages.
Fig. 1 – Draft
Damper Installation