USER MANUAL

load  onto  the  lift  using  an  adequate 

support according to the need, use so 

that the weight of the load will only be 

elevated in a vertical direction. 

Once this is done, start the SMART con-

trol  device  pressing  the  button 

S,

  all 

the control leds will start fl icking (If the 

leds do not fl ick, check if the batteries 

have power). If the led of the 

B

 area is 

on, replace the batteries (See point 4. 

Maintenance).

The  control  device  will  turn  off  auto-

matically after 5 minutes.

3.2 - STABILIZATION CONTROL:

The  leds  of  the 

E

  area  show  the  sta-

bilization  of  the  towerlift.  The  central 

green  led  indicates  the  tower  is  pro-

perly  stabilized.  The  other  12  red  leds 

around the central led represent each 

leg of the towerlift, if any of these leds 

are  turned  on,  the  towerlift  is  not  be 

properly stabilized.

To fi x the stabilization turn the handles 

of the stabilizers, located at the end of 

each leg.

3.3 - WEIGHT CONTROL OF THE LOAD:

To  make  the  load  cell  work  properly 

the  towerlift  must  have  at  least  one 

section  without  lifting  and  the  cable 

must be slack

, the ALS red locks should 

take the pressure off the load and re-

lease  strain  applied  on  the  cable.  To 

do  so,  once  the  towerlift  is  raised  at 

the  desired  height  and  the  last  ALS 

lock is locked in its corresponding hole, 

slack  the  cable  by  turning  the  winch 

crank anti-clockwise.

There  are  6  red  leds  on  the 

C

  area,  

they show the weight of the load pla-

ced on the forks, each led shows a per-

centage: 0%, 25%, 50%, 75%, 100% and 

OVER  LOAD.  Consult  the  maximum 

load and you will obtain the weight by 

observing the red led turned on in the 

SMART control device.

The  lift  should 

NEVER

  be  overloaded. 

Safety  at  work  is  the  most  important 

issue. 

3.4 - HEIGHT MEASUREMENT:

Thanks  to  the  SRS  system,  unique  to 

VMB, our towerlift rises each section in 

order,  being  the  fi rst  section  the  one 

that  carries  the  forks,  and  so  on  until 

all sections are at a maximum height.

With this unique feature we have been 

able  to  incorporate  a  measurement 

tape located at one side of the tower, 

this tape allows you to always know at 

what  height  the  forks  are,  with  a  sim-

ple glance.

Содержание SMART TOWERLIFT

Страница 1: ...V 04 14 OPERATING INSTRUCTIONS USER MANUAL MANUAL DE INSTRUCCIONES SMART TOWERLIFT TORRE ELEVADORA INTELIGENTE TOWERS ...

Страница 2: ...Export 34 96 171 81 86 Tlf Nacional 96 171 81 83 info prolifts es www prolifts es Manufacturer Fabricante Este manual de usuario es propiedad de PRO LIFTS S L Queda prohibida su reproducción total o parcial por cualquier medio que la tecnología actual permita Deposito legal y copyright 2014 Todos los derechos reservados MADE IN SPAIN EU ...

Страница 3: ...h Español S Start button Botón Inicio E Stabilization control leds Leds de control de estabilización C Weight control load leds Leds de control del peso de la carga B Low battery led Led de advertencia de batería baja A Height measurement tape Cinta métrica para medida de altura A Height measurement tape Cinta métrica medida altura INNOVATIONS ...

Страница 4: ...ll VMB products undergo very rigo rous testing under strict conditions and they are monitored continuously during the manufacturing process In order to guarantee the lifts function and safety only original parts from the manufacturer must be used If any parts other than those of the manu facturer are used or the product is modified in any way the user forfeits all warranty rights to claim VMB re se...

Страница 5: ...EIGHT CONTROL OF THE LOAD To make the load cell work properly the towerlift must have at least one section without lifting and the cable must be slack the ALS red locks should take the pressure off the load and re lease strain applied on the cable To do so once the towerlift is raised at the desired height and the last ALS lock is locked in its corresponding hole slack the cable by turning the win...

Страница 6: ...own in the tape of the next profile The following image 3 4 1 show the re ference point and the reading of the height measurement In image 3 4 1 it is shown an example of the reading of the tower s height In this example the height is between 2 40 m and 2 50 m we can estimate that the height of the tower is 2 48 m with a 5 cm tolerance TAPE PRECISION 5 cm ESTIMATION IN CENTIMETERS The height is 2 4...

Страница 7: ...ntightening the screws of the control device with an Allen key and take out the device carefully The batteries are located at the back of the device 5 GUARANTEE The warranty period for this device is 2 years from the date of purchase PRO LIFTS S L promises that from the date of purchase and during the wa rranty period to resolve any faults that may occur produced through defect material or fabrica...

Страница 8: ...las instrucciones completas y tenga en cuenta la información técni ca contenida en este manual Todos los productos de VMB se someten a pruebas muy rigurosas en condicio nes estrictas y son monitorizados con tinuamente durante el proceso de fa bricación Con el fin de garantizar el correcto funcionamiento y seguridad de los elevadores sólo deben ser uti lizadas piezas originales del fabrican te Si se...

Страница 9: ... del led central re presentan cada una de las patas de la torre si estos estuvieran encendidos la torre no estaría correctamente es tabilizada Para corregir la estabiliza ción gire las manivelas de los estabi lizadores situados en los extremos de las patas 3 3 CONTROL DE PESO DE LA CARGA Para que la célula de carga actue correctamente la torre debe tener al menos un tramo sin elevar y el ca ble de...

Страница 10: ...l último tramo que ha sido elevado por la acción del cabestrante Con esta referencia deberá leer la medida que se muestra justo en el siguiente perfil En la siguiente imagen 3 4 1 puede observar el punto de referencia y la lectura de la medida de altura En la imagen 3 4 1 se observa que la lectura de la altura de la torre se toma leyendo en la cinta métrica del siguiente tramo pero tomando como ref...

Страница 11: ...tivo de control con una llave Allen nº3 y extraiga el dispositivo cuidadosamente las pilas están colocadas en la parte trasera del dispositivo 5 GARANTÍA El período de garantía para el dispo sitivo SMART TOWERS es de 2 años a partir de la fecha de compra PRO LIFTS S L se compromete que a partir de la fecha de compra y duran te el período de garantía a resolver los fallos que puedan producirse de b...

Страница 12: ...88 Paterna Valencia Spain Tlf Export 34 96 171 81 86 Tlf Nacional 96 171 81 83 email info prolifts es web www prolifts es facebook vmblifts Canal VMBLifts Para más información consulte con nuestros técnicos en For further information follow the advise of our technicians ...

Отзывы: