Eccellenza Express – Service Manual
48
July 15, 2015
8.
Secure the tubing assembly to the new inlet valve with a new circle clamp
(Oetiker).
9.
Reconnect the power wires to the valve.
10.
Re-connect the water supply to the inlet valve.
11.
Switch the machine power on – the inlet valve will open and the water tank
will start filling.
12.
Check for leaks and repair, if required.
13.
Re-install the left side panel.