
ViZion DR + Straight Arm Installation Guide v2.0
Opal UAI 2.3.x.x
3
Customer Support
1.800.366.5343 –
VZDR-UG-ViZion DR + Straight Arm Installation Guide-D-16082013.2.0
10.
Install the front plate.
Figure 3
11.
Calibrate the generator
(refer to the Viztek Website Resource
page for more instructions if needed )
12.
Calibrate the panel
(refer to the Viztek Website Resource page
for more instructions if needed)
13.
Once generator and panel have been calibrated complete the following:
a.
Install top cover
b.
Slide grid into place
c.
Calibrate AEC
14.
Capture test shots.
Figure 3