![Vivax QH-1202 Скачать руководство пользователя страница 50](http://html.mh-extra.com/html/vivax/qh-1202/qh-1202_user-manual_1038206050.webp)
ENG
VIVAX
7
ASSEMBLY
Remove the heater and all the accessories from the carton.
The panel convector heaters should be wall-mounted only.
1. Remove both safety elements on the front grid, used as transport protection.
2. The quartz heater must be installed in a horizontal position only. Do not install at the
ceiling or vertically. During installation respect the minimum distances indicated in Fig.1.
3. Find the most appropriate position so as not to block access to the pull switch cord and
the switch, at all time respecting the safety distances indicated in Fig.1. Mark the holes
for mounting on the wall where the heater is to be installed: 77mm for the horizontal
position and 64 mm for the vertical position. Fix the quartz heater with the attached
dowel screws to the wall.
4. After assembly and electric installation on the wall the upper part can be swivelled to an
angle of max.60°
。
5. Arrange a convenient angle for the device and fix the mechanism by tightening both
lateral screws(Fig.2).
6. Now you can use the quartz heater.
PARTS DESCRIPTION
Fig 3:
Fig.1
Fig.2
Fig.3
Fig.4
40cm
40cm
50cm
180cm
ceeling
ground
1.
Heating element
2.
Outer cover
3.
Bracing wire
4.
Indicator
Содержание QH-1202
Страница 35: ...VIVAX ...
Страница 52: ...VIVAX ...
Страница 67: ...VIVAX ENG ...
Страница 68: ...VIVAX ...
Страница 72: ...www VIVAX com ...