![Vivax ACP-24CH70AEB Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/vivax/acp-24ch70aeb/acp-24ch70aeb_service-manual_1038075020.webp)
Service manual
15
8. Installation details
8.1
Wrench torque sheet for installation
Outside diameter
Torque
mm inch
Kg.m
φ
6.35
1/4 1.8
φ
9.52
3/8 4.2
φ
12.7
1/2 5.5
φ
15.88
5/8 6.6
φ
19.05
3/4 6.6
8.2
Connecting the cables
The power cord of connect should be selected according to the following specifications sheet.
Grade
Unit 7K 9K 12K
18K
21K
24K
28K
mm
2
1.0 1.0 1.5 2.5 2.5 2.5 2.5
8.3
Pipe length and the elevation
Pipe size
Capacity
Btu/h
GAS LIQUID
Standard
length
(m)
Max.
Elevation
B (m)
Max.
Elevation
B (m)
Additional
refrigerant
(g/m)
3/8’’ (
φ
9.52) 1/4’’
(
φ
6.35)
5 5 10 30
7k~12K
1/2’’ (
φ
12.7) 1/4’’
(
φ
6.35)
5 5 10 30
1/2’’ (
φ
12.7) 1/4’’
(
φ
6.35)
5 8 15 30
5/8’’ (
φ
15.88) 1/4’’
(
φ
6.35)
5 10 20 30
18K~28K
5/8’’ (
φ
15.88) 3/8’’
(
φ
9.52)
5 10 20 65
5/8’’ (
φ
15.88) 3/8’’
(
φ
9.52)
5 15 30 65
30K~36K
3/4’’ (
φ
19.05) 3/8’’
(
φ
9.52)
5 15 30 65
Caution:
Capacity is base on standard length and maximum allowance length is base of reliability.
Oil trap should be install per 5-7 meters.
In case that
more than 5m.
Содержание ACP-24CH70AEB
Страница 1: ...ACP 24CH70AEB RoHS Service manual ENG ...
Страница 2: ......
Страница 5: ......
Страница 14: ...Service manual 9 5 Refrigerant cycle diagram Cooling only Heat pump mode ...
Страница 18: ...Service manual 13 7 2 Wiring diagram MSE 21CRN2 MSE 24CRN2 MSE 28CRN2 ...
Страница 19: ...Service manual 14 MSE 21HRN2 ACP 24CH70AEB MSE 28HRN2 ...
Страница 48: ......
Страница 49: ......
Страница 50: ......