
Section 3 HDD Installation
Installation of Hard Drive/ Hard drives.
1. Remove DVR Lid (Five screws).
2. Remove HDD mounting bracket.
3. Fit HDD’s onto bracket using supplied mounting screws. (up to Six HDD’s ).
4. Plug HDD cable into SATA port on the main board.
5. Plug HDD cable into SATA port on HDD.
6. Connect the ATX power cable to the power connection on the HDD. Pay attention to
the correct orientation.
7. Replace HDD mounting bracket.
8. Replace the top of the DVR enclosure (five screws).
Section 4 Back panel Layout
Back panel layout of the standalone series 24-channel and
32-channel DVR is as follows.
The height of the case is 2U and the dimensions of the unit are 460×440×100mm.
Figure 1. 24-channel and
32-channel DVR back layout
Detailed illustration of the audio, video, PTZ control and alarm input/output of the
24-channel and 32-channel DVR: