5
011.02.1108
In 5L connect bolt extender (6055) and latch
(6050) (5L.6).
In 5R note the position of the prepared holes
in (6016) for the handle and lock. Assemble
the door handle as shown (5R.6).
Ensure that the door is totally square before
tightening all bolts. This can be done by
measuring the diagonals.
Connect the plastic door guides (6057) onto
bar (6014) with screws (6062) (5.2).
Loosely connect the door wheels (6049) and
door jump clips (6039) to bottom bar (6017)
using bolt (6046), washers (6051) and nut
(3002) (5.4). These should be tightened when
the door is later fitted in the building.
Repeat for both doors and lay them aside for
later use.
6. veNtS
The position of vents is determined by the
location of the prepared holes in eave angle
(6072).
Note:
Warm window seal (6034) to room
temperature!
Press seal (6034) centrally onto
the top edge of glass pane (C) (6.1).
Do not
stretch.
Make a cut into the seal at the corner (6.2) and
then press the seal onto the side and bottom
edges of pane (C), cutting to fit around each
corner.
Fit vent bottom bar (6024) over the seal
(6.3) and then side bars (6020) and (6021).
Connect these at the corners using screws
(1003) (6.4).
Finish pressing the seal onto the top edge and
cut to length in the middle. Fit the top vent bar
(6025) and connect to side bars (6020) and
(6021) with screws (1003) (6.5).
Ensure that the vent is totally square before
tightening all screws.
Loosely connect bar (6066) using bolt (3001)
onto eave angle (6072) using the prepared
holes (6.6).
Remove side brace (6003) and diagonal brace
(6008) to fit vent sill (6019) behind them (6.7).
Replace (6003) and then (6008), loosely
connecting with nut (3002) (6.7) (6.8). Do
not tighten until the roof vent is assembled in
building.
Repeat for all vents and lay them aside for
later use.
7. glazINg
Please note the already mentioned safety
precautions.
Ensure that the U/V protected face of all
polycarbonate sheets is on the outside.
With one person using the step ladder inside
the building, glaze the roof by sliding panes
(D),(E) and (F) into the appropriate guides in
the roof bars (6087) and (6088) (7.2) (7.3).
When adjacent panes are in place connect
ends (6077), (6078) or (6079) using screws
(7349) (7.4) to prevent them sliding out of the
guides.
Position door guide bar (6074) onto eave
angle (6072) / (6073) and fix in place using 3
equally spaced screws (6068) (7.6) (7.7).
Press the glazing seals (1020) onto all side
bars (6013) and (6022) (7.5) and cut to length.
Fit the glazing panes (G), (H) and (J) as
shown and fix by pressing plastic fixing strips
(6030) or (6032) onto each side (7.6) & (7.7).
Now tighten the bolts connecting the building
to the foundation.
8. PoSItIoNINg of veNtS aND DooRS
Lift the vents into the prepared positions in
the sides by loosening bar (6066) and sliding
bar (6025) into bar (6066) from one end (8.1)
& (8.2). Lift vent sill bar (6019) and fit it to the
vent. When correctly positioned tighten all
bolts on the inside.
Bolt the vent opener (1067) onto bar (6024)
using screws (6062) (8.3).
Connect both vent fixers (6056) onto sill bar
(6019) using screws (6062) (8.3).
Place the plastic cap (1019) over the end of
the window opener (1067) (8.3).
Position the doors by inserting the plastic door
guides (6057) into bar (6074) (8.4) (8.5) and
then lower the wheels onto the door track on
bar (6002) (8.6). Hook the door jump clips
(6039) under the lip on (6002) and tighten the
door wheel bolts (6046) (8.6) (8.7).
Connect plastic nut caps (6070) by pushing
them onto all visible nuts (3002) inside the
building (8.8).
Connect down pipe elbow (1402) to down
pipe (1415). At 3 not adjacent corners connect
the down pipe assembly (1402) / (1415) to
eave ends (6067) (8.9). Hook clamp (1414)
onto corner bars (6022) at the height of elbow
(1402) and insert screw (1006) into the prepa-
red hole in (1414) (8.10). Use the ø 20 drill to
make the drainage holes in the 3 eave ends
(6067) noting the marked area.
Inside the greenhouse slide glazing spacers
(6075) or (6076) onto eave angles (6072) /
(6073). Fix these to eave angle (6072) central-
ly using screw (7349). (8.11) (8.12).
fINIShINg
If desired, it is possible to seal the greenhouse
at the edges and between the glazing and
spacers (6075) or (6076) using neutral silicone.
Silicone is not in cluded.
Place the warning label inside the building.
A full range of greenhouse accessories, to
help you make the most of this product, is
available from your stockist. Please inform
yourself as to the possibilities.
Safety NotIce
In the event of high wind conditions, close the
doors and all vents.
In the event of heavy snowfall, clear the roof
of the building or take suitable measures to
support the roof. Heat the building in winter.
commeNtS
For the complete protection of your new
green house, we advise you to include it in
your
house insurance.
Please take note
of possible building rules relating to the
positioning of greenhouses.
Please stick the included greenhouse model
label onto the door bar (6014) after success-
fully assembling this product. This information
is important in the event that replacement
parts are later required.
Please keep these Assembly Instructions in a
safe place, for future reference!
Our policy is one of continuous improvement
and we reserve the right to change the specifi
-
cations without prior notice.
Содержание Hera 2 9000
Страница 23: ......