background image

Griffith Swing Arm

Item # SK 2109

ASSEMBLY INSTRUCTIONS

This light fixture should be installed in accordance with all applicable, 
local installation codes, and by a person familiar with the construction 
and operation of it, as well as the hazards involved. Inspect item and 
contents carefully. If any damage or defect is found, do not install. 
Retain all packaging material until installation is complete and approved.

NOTICE:

Hardwire assembly

US

 M

L I

D

S E

T

1.    Carefully remove all parts from the box. Place on a clean, soft surface.
2.    Remove portable mounting plate 

(D)

 from backplate 

(E)

 by removing 

       screws 

(C)

.

3.    Install mounting plate 

(N)

 to the junction box and secure with ‘

       mounting screws 

(O)

.

4.    Remove cord covers and portable cord by loosening the wire nuts.
5.    Insert direct wire plug 

(Q)

 to the bottom of backplate 

(E)

.

6.    Wrap fixture ground wire (bare copper) around the green grounding
       screw (see diagram 1). Tighten. Continue fixture ground wire and
       connect to supply ground wire (usually green or bare copper) using
       wire nut 

(P)

.

       

NOTE

: It is imperative that the fixture is grounded.

7.    Connect fixture neutral wire (white) to the supply neutral wire (usually
       white) using wire nut 

(P)

.

8.    Connect fixture hot wire (black) to the supply hot wire (usually black) 
       using wire nut 

(P)

.

       

CAUTION

: Do not reverse the hot and neutral connections.

9.    Make sure all wire connections are tight, then carefully tuck into the
       junction box.
10.  Install backplate 

(E)

 to mounting plate 

(N)

 and secure with screws 

(C)

.   

TOOLS REQUIRED (NOT INCLUDED):

Phillips Screwdriver

Slotted Screwdriver

Scissors

Diagram 1

N

O

P

C

E

Q

Bulb not included

I

H

J

K

X

Y

Отзывы: