First time setup
A typical installation should take 2 people around 90 minutes.
Insure there is nobody on the trampoline when
installing the device.
Make sure that the targets are on the correct
side they are marked on the back side.
Make sure that the buttons and targets are
correctly oriented and clear of any obstructions.
Make sure the electrical power is off during
installation.
The buttons and targets are pre assigned to
only one computer that came with the game
set, you can’t switch them with other systems.
And they are also assigned to the correct side.
Follow the labels on the dodge targets for
correct installation (L is left, R is right 1-4 is the
position, 1 is closest to the monitors)
STEP 03
STEP 01
STEP 02
Install the Start button (A) below
the display. Approximate 150cm
(4.9 feet) from ground.
Fasten Start button (A) to the
construction with the provided wing
nuts (N) and spacers (O).
Avoid trapped and pinched cables.
150 cm
A
!
N
O
N
O
3xB
3xA
O
!!
F
Install the targets (S)(T) on their correct
side.
The target side preset is written on
the back of the target. Follow the
labels on the dodge targets for correct
installation (L is left, R is right 1-4 is the
position, 1 is closest to the monitors).
4xS
4xT
Right side
of court
Left side
of court
1L
1R
2L
2R
3L
3R
4L
4R
VISI DODGE –
INSTALLATION MANUAL
6
Содержание VISIDODGE
Страница 1: ...Version 1 0 2021 Installation manual ...