![Vision Engineering Swift PRO Cam Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/vision-engineering/swift-pro-cam/swift-pro-cam_user-manual_1031743011.webp)
Assembly
www.visioneng.com/support
5
Stage assembly (150mm x 100mm & 200mm x 100mm)
`
Use the stand’s levelling foot
u
to ensure the base is stable.
`
Place the stage on the stand ensuring the retractable foot
(position B4 in diagram
v
below) is fully retracted.
`
Check the stand stage mount feet
w
and the underside of
the stage
x
are clean and free
of any debris.
`
Loosely fit the stage bolts
y
in
position B1, B2 and B3 (also
in diagram
v
) to a light (finger
tight) tension.
If this is a video system,
do not tighten the stage bolts
as the stage will need to be
aligned (see page 7).
For systems with an optical head
only (no video camera), tighten the
stage bolts in the sequence shown in
v
to a torque of 2.8Nm.
`
Remove all red transit clamps from the stage.
y
y
y
w
u
x
Column
Stage Assembly
B4
B3
B1
B2
v
Содержание Swift PRO Cam
Страница 2: ......
Страница 8: ...System equipment www visioneng com support 2 Head QC 3000 Controller PC Monitor Keyboard and mouse...
Страница 22: ......