LVDT
Signal
Conditioner
LVD
3
13
Signal
conditioner
module
Figures
2
and
5.
First
check
the
connections
and
that
all
relevant
switch
settings
on
the
board
have
been
done.
Select
primary
feedback,
(SW2
in
position
‘PRIM.’)
to
simplify
the
fault
finding.
Then
check
the
module
in
conjunction
with
the
transducer.
Power
supply
Check
the
power
supply
to
the
module,
measuring
with
a
DC
voltmeter:
+24
V
DC
at
terminal
11,
0
V
24
at
terminal
12.
Observe
that
the
module
has
one
internal
fuse
for
each
channel.
Output
from
oscillator
Check
the
output
signal
from
the
oscillator
to
the
transducer
primary
coil,
measuring
with
an
AC
voltmeter:
3.3
–
3.5
V
AC
at
terminals
1
and
2.
If
there
is
no
voltage,
disconnect
the
transducer
and
check
the
output
again.
If
there
is
still
no
voltage,
(NOTE,
SW2
must
be
set
for
primary
feedback),
it
indicates
that
the
internal
fuse
may
be
blown.
In
other
cases
there
is
a
fault
in
the
oscillator,
and
the
circuit
board
must
be
changed.
If
the
fault
disappeared,
the
transducer
and
transducer
cable
must
be
checked
with
respect
of
short
‐
circuits.
If
the
oscillator
function
is
correct
you
can
proceed
and
check
the
input
signals
from
the
transducer.
Input
signals
from
transducer
Input
signals
to
LVD
3
from
the
transducer
can
be
checked
at
the
test
sockets
Sec.
1
and
Sec.
2.
First
ensure
that
the
transducer
primary
coil
is
supplied
from
the
oscillator,
measuring
at
test
sockets
Prim.
–
Com.
(3.3
–
3.5
V
AC).
Then
check
the
AC
voltage
at
Sec.
1
–
Com.
and
Sec.
2
–
Com.
respectively.
Check
that
the
voltage
decreases
for
one
coil
and
increases
for
the
other
when
the
transducer
core
position
is
changed.
Also
check
that
the
AC
voltage
between
Sec.
1
and
Sec.
2
is
close
to
zero
when
the
transducer
core
is
in
the
centre
position.
If
not,
the
connections
for
one
of
the
secondary
coils
must
be
reversed.
If
this
checking
with
primary
feedback
is
satisfactory,
faults
in
the
oscillator,
transducer
and
transducer
cable
can
be
excluded.
Содержание LVD 3
Страница 1: ...Op Ins erati tallat ng a tion i and instru LVDT uctio T Sig ons nal co onditi LV oner D 3 GB ...
Страница 2: ......
Страница 4: ......
Страница 14: ...Operating and Installation instructions 10 ...
Страница 20: ......
Страница 22: ......
Страница 23: ...LVDT Sign A De nal Condition ppendix 2 eclaration o ner LVD 3 2 of Conformi ity ...
Страница 24: ......
Страница 25: ......