background image

Iss 8 - Mar 2019 

 

Page 4 of 9 

 

 

 

 
 
 
 
 
 
 
 
 

Fig. B - Identification label breakdown 

 

Mounting of the charge point 

The charge point should be mounted vertically on either a post or a wall.  The position of the charge 
point should allow all main functions of the charge point to be accessible between 750mm and 1200mm 

of the ground in accordance with BS8300:2009, unless otherwise instructed not to. The charge point has 
four integrated mounting holes that are accessible by removing the cover strips (Fig. A - 4). 
 
 

Internal components 

 

 

1.

 

Contactor 

2.

 

RCBO 

3.

 

EPC 

4.

 

Mains input Earth terminal 

5.

 

Main charge point earth point. 

6.

 

Label stating the equipment must be earthed 

 

 

 

 

 

 

 

 

 
 

Mounting hole 

 

Model 
Number 

Charging 
Current 

Serial 
Number 

Fig. C 

 Inside the box 

 

Содержание M03-T1C-16A-1P

Страница 1: ...Guidance to Installers of Viridian EV charge points ...

Страница 2: ...icates where failure to comply with instructions could lead to death or serious injury CAUTION Indicates where failure to comply with instructions could lead to minor or moderate injury This document is intended to instruct in the installation of all models of Viridian manufactured charge points current model numbers at the time of writing listed below Instructions specific to particular models wi...

Страница 3: ...ent a risk of electric shock CAUTION The Charge point is covered by a manufacturers parts and labour warranty Alterations to the charge point that are not permitted will invalidate this warranty Fig A Charge point Features 1 The charge point connects to an EV via the attached vehicle coupler shown right or via the socket shown left Models fitted with sockets allow the use of a range of approved in...

Страница 4: ... accessible between 750mm and 1200mm of the ground in accordance with BS8300 2009 unless otherwise instructed not to The charge point has four integrated mounting holes that are accessible by removing the cover strips Fig A 4 Internal components 1 Contactor 2 RCBO 3 EPC 4 Mains input Earth terminal 5 Main charge point earth point 6 Label stating the equipment must be earthed Mounting hole 6 Model ...

Страница 5: ...rk to be carried out on the unit without removal of the front panel Install a MCCB within the consumer unit that is appropriately rated for the charge point s that is being installed Drill an appropriate sized hole on the side of the charge point for a cable gland ensuring that no damage is done to any internal components or wiring and removing any burrs and swarf that may have been generated in t...

Страница 6: ...tall please ensure o The customer receives the User Guide for Viridian EV Charge point leaflet o The customer receives a demonstration on how to use the charge point and its features o You demonstrate the RCBO test function and instruct them to do this monthly o The customer is shown how to isolate the power to the charge point in the event of an electrical fault o The customer receives informatio...

Страница 7: ...r analysis Procedure Isolate all power to the charge point Disconnect the wiring from the affected component by loosening the terminals Remove the device by pulling the locking slider and swivel the device away from the DIN rail Install a new device by placing it over the DIN rail and firmly pushing it down until it clicks into place Reconnect all wiring and check that all connections are tightene...

Страница 8: ...Iss 8 Mar 2019 Page 8 of 9 THIS PAGE INTENTIONALLY LEFT BLANK ...

Страница 9: ...age 9 of 9 Viridian EV is a trading name of EcoHarmony Ltd Viridian EV Units B C The Mallards South Cerney Cirencester Gloucestershire GL7 5TQ Tel 44 0 177 230 7172 Web www viridianev co uk Email info viridianev co uk ...

Отзывы: