background image

V

V

E

E

R

R

T

T

E

E

X

X

 

 

 

 

I

I

N

N

T

T

E

E

G

G

R

R

A

A

T

T

I

I

O

O

N

N

 

 

P

P

R

R

O

O

C

C

E

E

D

D

U

U

R

R

E

E

 

 

 

24-00163-00 

2 2   O c t   2 0 0 9    

 

F O R   I N T E R N A L   U S E   O N L Y  

T h i s   d o c u m e n t   c o n t a i n s   c o n f i d e n t i a l   i n f o r m a t i o n   t h a t   i s   p r o p r i e t a r y  t o   Ar i s t o c r a t .   I t   m a y  n o t   b e   c o p i e d   o r   d i s c l o s e d   t o   u n a u t h o r i z e d   p a r t i e s .                    
©   2 0 0 9   Ar i s t o c r a t   T e c h n o l o g i e s   Au s t r a l i a   P t y  L i m i t e d .   Al l   r i g h t s   r e s e r ve d .  

5

  o f   8  

 

S

S

T

T

E

E

P

P

 

 

4

4

:

:

 

 

 

 

L

L

i

i

n

n

k

k

 

 

V

V

e

e

r

r

t

t

e

e

x

x

 

 

w

w

i

i

t

t

h

h

 

 

B

B

a

a

n

n

k

k

 

 

C

C

o

o

n

n

t

t

i

i

n

n

u

u

e

e

d

d

 

H

H

.

.

 

Follow the onscreen instructions to return to the “previous menu” (

G2S

 CONFIGURATION MENU

).

 

I

I

.

.

 

 On the 

G2S

 CONFIGURATION MENU

,

 

select

 

Communications Setup.

 

J

J

.

.

 

When the 

G2S Communications Setup 

screen appears, make note of the EGM ID. 

 

K

K

.

.

 

Follow the onscreen instructions to “return to the previous menu” to the 

Operator Mode Menu

L

L

.

.

 

Turn the Audit Key to reboot the machine. 

M

M

.

.

 

Repeat Steps A through M for all remaining EGMs in the bank. 

S

S

T

T

E

E

P

P

 

 

5

5

:

:

 

 

 

 

 

 

S

S

t

t

a

a

r

r

t

t

 

 

C

C

o

o

n

n

t

t

r

r

o

o

l

l

l

l

e

e

r

r

 

 

 

 

A

A

.

.

 

From the 

Vertex Shell

, double-click 

Controller

 to open the 

Controller Setup

 window. 

B

B

.

.

 

Press 

Start Controller.

 

 

Содержание Aristocrat Vertex

Страница 1: ...t y y 25ft CAT6 Cable 07 21139 1 24 Port Switch 07 30086 1 Vertex Jackpot Controller 579849 1 Test Cart Equipped with LCD Monitor USB Keyboard with Built in USB Hub USB Mouse Vertex Power Cord Vertex CAT5 Cable N A 1 PROCEDURE S ST TE EP P 1 1 M M o o u u n n t t a a n n d d C C o o n n n n e e c c t t V V e e r r t t e e x x A A Retrieve the Vertex Jackpot Controller and Switch box from Tek Chek ...

Страница 2: ...ide the designated shelf on the conveyor B B Connect the CAT5 Vertex cable to the Switch C C If necessary disconnect the existing CAT5 cable from the Carrier Assembly D D Connect the Retractable CAT5 Machine cable to each corresponding EGM E E For each CAT5 Machine cable connected plug the corresponding Switch cable into the Switch FOR EXAMPLE If Retractable CAT5 Cable No 1 is connected to an EGM ...

Страница 3: ... i c c a a t t i i o o n n A A Turn the Vertex Jackpot Controller ON switch is located on the front of the box B B When the Vertex Shell appears on the Test Cart LCD make note of the Vertex IP Address lower right for future reference you ll need it to link the Jackpot Controller with the Bank S ST TE EP P 4 4 L L i i n n k k V V e e r r t t e e x x w w i i t t h h B B a a n n k k Proceed with the ...

Страница 4: ...k C C o o n n t t i i n n u u e e d d C C On the G2S HOST SETUP menu follow the onscreen instructions to add host address D D When the onscreen keyboard appears on the EGM Main LCD enter the Vertex IP Address The Host Address Vertex IP Address MUST be entered in the following format Vertex IP address g2shost For example 192 168 1 21 g2shost E E When finished entering the Vertex IP Address click th...

Страница 5: ...C C o o n n t t i i n n u u e e d d H H Follow the onscreen instructions to return to the previous menu G2S CONFIGURATION MENU I I On the G2S CONFIGURATION MENU select Communications Setup J J When the G2S Communications Setup screen appears make note of the EGM ID K K Follow the onscreen instructions to return to the previous menu to the Operator Mode Menu L L Turn the Audit Key to reboot the mac...

Страница 6: ... reserved 6 of 8 S ST TE EP P 5 5 S S t t a a r r t t C C o o n n t t r r o o l l l l e e r r C C o o n n t t i i n n u u e e d d C C Click OK to return to the Vertex Shell D D Verify the Controller is Running The Controller must be Running before moving onto the next step S ST TE EP P 6 6 L L o o g g i i n n t t o o V V e e r r t t e e x x A A On the Vertex Shell double click User Interface B B L...

Страница 7: ...he Casino Management main window click the Add button to open the Casino List C C Enter the name and address of the Casino associated with the order and click Save S ST TE EP P 8 8 L L i i n n k k M M a a c c h h i i n n e e s s w w i i t t h h V V e e r r t t e e x x A A Select EGM Management from the Modules dropdown menu B B On the EGM Management main window click the Add button C C When the Ad...

Страница 8: ... e e r r t t e e x x C C o o n n t t i i n n u u e e d d G G When finished linking the entire Bank of machines verify the EGMs are communicating properly with Vertex Once a machine is linked the EGM ID will appear in GREEN when the machine is successfully communicating with the Jackpot Controller The EGM ID will appear in RED to indicate faulty communication See below S ST TE EP P 9 9 C C o o m m ...

Отзывы: