V
V
E
E
R
R
T
T
E
E
X
X
™
™
I
I
N
N
T
T
E
E
G
G
R
R
A
A
T
T
I
I
O
O
N
N
P
P
R
R
O
O
C
C
E
E
D
D
U
U
R
R
E
E
24-00163-00
2 2 O c t 2 0 0 9
F O R I N T E R N A L U S E O N L Y
T h i s d o c u m e n t c o n t a i n s c o n f i d e n t i a l i n f o r m a t i o n t h a t i s p r o p r i e t a r y t o Ar i s t o c r a t . I t m a y n o t b e c o p i e d o r d i s c l o s e d t o u n a u t h o r i z e d p a r t i e s .
© 2 0 0 9 Ar i s t o c r a t T e c h n o l o g i e s Au s t r a l i a P t y L i m i t e d . Al l r i g h t s r e s e r ve d .
2
o f 8
S
S
T
T
E
E
P
P
2
2
:
:
M
M
o
o
u
u
n
n
t
t
a
a
n
n
d
d
C
C
o
o
n
n
n
n
e
e
c
c
t
t
S
S
w
w
i
i
t
t
c
c
h
h
B
B
o
o
x
x
A
A
.
.
Set the 24-port Switch Box inside the designated shelf on the conveyor.
B
B
.
.
Connect the CAT5 Vertex cable to the Switch.
C
C
.
.
If necessary, disconnect the existing CAT5 cable from the Carrier Assembly.
D
D
.
.
Connect the Retractable CAT5 Machine cable to each corresponding EGM.
E
E
.
.
For each CAT5 Machine cable connected, plug the corresponding Switch cable into the Switch.
FOR EXAMPLE
:
If Retractable CAT5 Cable No. 1 is connected to an EGM, then you must plug
CAT5 Switch Cable No. 1 into the Switch.
F
F
.
.
Repeat Steps C through E for all remaining EGM’s in the bank.
Retractable CAT5 Machine Cables are numbered to correspond with CAT5 Switch Cables.
G
G
.
.
Turn each EGM ON.
H
H
.
.
While the EGM’s are booting up, move onto the next step to setup the Jackpot Controller.