Viqua S2Q-PV Скачать руководство пользователя страница 10

Specifications

10

4.3 Alarm Connection

An Alarm feature is provided in the vending ballast allowing for dry contact connection for indicating when the system goes 

into a lamp OFF alarm condition and the UV unit is no longer disinfecting the water source. The Alarm contacts are 

controlled by an internal relay within the ballast. When the unit is functioning and the lamp is ON the C to NO connection is 

closed and the C to NC connection is open. When the UV lamp turns off the ballast senses this alarm condition and causes 

the relay to shut off. This now causes the C to NO connection to open circuit and the C to NC to close. These connections 

can be configured in any manner appropriate for your application.

1.

To connect to these contacts pull to remove the detachable terminal connecting plug from the Alarm side of the ballast.

2.

Connect the appropriate wire configuration required as identified on the connector label. C is the common point; NC is 

open and NO is closed when the system is operating properly.

Note: 

Contact Rating Maximum of 2.0 amps @ 240VAC

3.

Once the connections are made secure the wires with the terminal screws and plug the connector back onto the ballast 

Alarm side.

Section 5

Specifications

C A U T I O N

Ensure Alarm connector is connected to the Alarm side of the Ballast.

Model

S2Q-PV

S5Q-PV

S5Q-PV-ASPL

Flow R

ate

1

US Public Health 16mJ/cm

2

5 gpm (19 lpm) (0.9 m

3

/hr)

11 gpm (42 lpm) (2.5 m

3

/hr)

11 gpm (42 lpm) (2.5 m

3

/hr)

Standard 30 mJ/cm

2

3 gpm (11 lpm) (0.7 m

3

/hr)

6 gpm (23 lpm) (1.4 m

3

/hr)

6 gpm (23 lpm) (1.4 m

3

/hr)

NSF/EPA 40 mJ/cm

2

2 gpm (7 lpm) (0.5 m

3

/hr)

4.5 gpm (17 lpm) (1.0 m

3

/hr)

4.5 gpm (17 lpm) (1.0 m

3

/hr)

D

imensions

Length

47 cm (18.5”)

56 cm (22”)

56 cm (22”)

Width

6.5 cm (2.5”)

6.5 cm (2.5”)

6.5 cm (2.5”)

Height

6.5 cm (2.5”)

6.5 cm (2.5”)

6.5 cm (2.5”)

Diameter

6.5 cm (2.5”)

6.5 cm (2.5”)

6.5 cm (2.5”)

Shipping Weight

2.7 kg (6 lbs)

2.7 kg (6 lbs)

2.7 kg (6 lbs)

Electr

ical

Voltage

100-250 V / 50/60 Hz

100-250 V / 50/60 Hz

100-250 V / 50/60 Hz

Max. Current 

0.6 Amp

0.6 Amp

0.6 Amp

Power Consumption

19 W

26 W

26 W

Lamp Watts

17 W

22 W

22 W

Maximum Operating Pressure

125 psi (861 kPa)

125 psi (861 kPa)

125 psi (861 kPa)

Minimum Operating Pressure

15 psi (103 kPa)

15 psi (103 kPa)

15 psi (103 kPa)

Ambient Water Temperature

2-40 ºC (36-104 ºF)

2-40 ºC (36-104 ºF)

2-40 ºC (36-104 ºF)

Inlet/Outlet Port Size

1/2” MNPT

3/4” MNPT

3/8” NPTF

Visual “Power-On”

Yes

Yes

Yes

Chamber Material

304 SS

304 SS

304 SS

Units ending in "/MEX" meet the requirements established in the Mexican Official Norm NOM-244-SSA1-2008

Содержание S2Q-PV

Страница 1: ...ario Canada N1L 1R1 t 1 519 763 1032 tf 1 800 265 7246 US and Canada only t 31 73 747 0144 Europe only f 1 519 763 5069 e mail info viqua com www viqua com Models S2Q PV S5Q PV S5Q PV ASPL Owner s Manual Powered by 520026_RevM ...

Страница 2: ...hy should you insist on genuine factory supplied VIQUA replacement lamps Use of widely available non genuine replacement lamps has been shown to damage the control module of VIQUA UV disinfection equipment An increasing number of calls to VIQUA Technical Support are connected with non genuine lamps being used unknowingly as replacements Damage arising from the use of non genuine lamps poses a safe...

Страница 3: ...GFCI This symbol indicates there is a potential for VERY hot water when flow is started DANGER Failure to follow these instructions will result in serious injury or death Electric Shock To avoid possible electric shock special care should be taken since water is present near the electrical equipment Unless a situation is encountered that is explicitly addressed by the provided maintenance and trou...

Страница 4: ...ry If the lamp breaks then avoid inhalation or ingestion of the debris and avoid exposure to eyes and skin Never use a vacuum cleaner to clean up a broken lamp as this may scatter the spilled mercury Obey local regulations and guidelines for the removal and disposal of mercury waste NOTICE The UV lamp inside the disinfection system is rated at an effective life of approximately 9000 hours To ensur...

Страница 5: ...tems 2 Spring SP008 Used on all systems 3 Chamber Used on all systems 4 Connector base 270276 Used on all systems 5 Open Ended 214 fused quartz sleeves with fire polished ends QS 330 S2Q PV QS 463 S5Q PV ASPL S5Q PV 6 O ring 410867 R Used on all systems 7 Retaining nut RN 001 Used on all systems 8 Hard glass coated Sterilume EX UV lamps for long consistent life 9000 hours S330RL S2Q PV S463RL S5Q ...

Страница 6: ...l fire hazard Drip loops in all cordage connected to controller is highly recommended The complete water system including any pressure or hot water tanks must be sterilized before start up by flushing with chlorine household bleach to destroy any residual contamination The disinfection system is intended for indoor use only Do not install disinfection system where it may be exposed to the weather ...

Страница 7: ...n power must be removed for 30 seconds to allow ballast to reset 2 As the system requires time to reach its full operating capacity please allow the disinfection system to operate 3 5 minutes prior to using the water from the unit In addition to clear any air or debris from the system allow water to run through the disinfection system for 2 3 minutes when using an RO application run the water for ...

Страница 8: ... allow the unit to cool for 10 minutes 3 1 2 Remove the lamp connector by squeezing the plastic locking tabs on the side of the connector 4 Hg UV Remove the UV lamp in upward direction from the chamber and lamp connector base Hold the UV lamp at the ceramic ends 5 Hg UV 1 2 Insert the new lamp fully into the chamber leaving about two inches of the lamp protruding from the chamber 6 Attach the conn...

Страница 9: ...using the drain port 2 1 2 3 Remove the bottom retaining nut floating spring and O ring 3 1 2 Remove the top retaining nut and O ring 4 Remove the quartz sleeve 5 Mild Acid Clean the quartz sleeve with a cloth soaked in CLR vinegar or some other mild acid and then rinse with water 6 Reinstall the quartz sleeve in the UV chamber allowing the sleeve to protrude an equal distance at both ends of the ...

Страница 10: ...rews and plug the connector back onto the ballast Alarm side Section 5 Specifications C A U T I O N Ensure Alarm connector is connected to the Alarm side of the Ballast Model S2Q PV S5Q PV S5Q PV ASPL Flow Rate 1 US Public Health 16mJ cm2 5 gpm 19 lpm 0 9 m3 hr 11 gpm 42 lpm 2 5 m3 hr 11 gpm 42 lpm 2 5 m3 hr Standard 30 mJ cm2 3 gpm 11 lpm 0 7 m3 hr 6 gpm 23 lpm 1 4 m3 hr 6 gpm 23 lpm 1 4 m3 hr NS...

Страница 11: ...r Electrical and Hardware Components VIQUA warrants the electrical controller and hardware components to be free from defects in material and workmanship for a period of three 3 years from the date of purchase During this time VIQUA will repair or replace at its option any defective parts covered by the warranty Please return the defective part to your dealer who will process your claim One Year L...

Страница 12: ...425 Clair Rd W Guelph Ontario Canada N1L 1R1 t 1 519 763 1032 tf 1 800 265 7246 US and Canada only t 31 73 747 0144 Europe only f 1 519 763 5069 e mail info viqua com www viqua com ...

Отзывы: