![Viqua Adenovirus PRO24-186 Скачать руководство пользователя страница 5](http://html.mh-extra.com/html/viqua/adenovirus-pro24-186/adenovirus-pro24-186_user-manual_1029847005.webp)
2
2.0 P
RODUCT
D
RAWINGS
2.1
Install Diagram
The following diagram is the recommended installation layout; however, other
installation set-ups are possible, including a mirrored layout to the one featured here.
Chambers must be installed vertically and right side up, according to the indicators on
the chambers. Ensure there is room above the chambers for lamp removal.
1
Sample Valve
2
Pre-treatment
3
Shu-off Valve
4
Sample Valve
5
Flow Sensor
6
Sensor (2)
7
Primary UV Chamber
8
Secondary UV Chamber
9
CoolTouch
TM
Fan
10
Controller (2)
11
COMMcenter
TM
12
Solenoid Valve
13
Power Source