3.3 Commissioning
CAUTION!
– Before commissioning the device must be brought to
room temperature.
– At condensation the device must be absolutely dry
before connected to power.
– To avoid overheat during operation the device must not
be laid open to direct sun light.
– After opening the control cabinet or desk, there are
parts with possible dangerous voltage available.
– For all signal connections only screened cables are
permitted.
– Signal cables must not be let within the same cable
shaft as high voltage cables.
3.4 Connection to a PLC system
For the inclusion into your PLC system several HMI/SCADA project-
engineering platforms are at your disposal that has to be installed at
an external PC. Here you may create your project, where appropriate
simulate it and transfer it to the Panel PC that you’ve entered before.
Via the at the Panel PC pre-installed runtime version of the HMI/
SCADA project engineering platforms your project is run able.
By using the according communication driver, the Panel PC supports
connecting options to the PLC via Ethernet.
During operation your operating device communicates with the
according PLC and reacts to the application courses in the PLC
according to the configured processes. Via dialogues configured
before, process values may be monitored graphically, altered and
evaluated.
Overview
VIPA HMI Panel PC
Deployment Panel PC
Connection to a PLC system