CP143 H1 / TCP/IP manual
List of figures
Rev. 00/07
D-1
D List of figures
Fig. 1-1: Construction of the CP143 H1 or TCP/IP ..........................................................................1-3
Fig. 2-1: Example for the cabling of the Industrial Ethernet H1 LAN .............................................2-2
Fig. 2-1: ISO-OSI level model ..........................................................................................................2-3
Fig. 3-1: Parts of an ethernet network...............................................................................................3-1
Fig. 3-2: Thin ethernet network hardware.........................................................................................3-4
Fig. 3-3: Example for a thin-ethernet cable network ........................................................................3-5
Fig. 3-4: thick-ethernet network hardware........................................................................................3-9
Fig. 3-5: Example for a thick-ethernet network ..............................................................................3-10
Fig. 3-6: Adapters for linking unlike segments...............................................................................3-14
Fig. 3-7: Example of a network combining thin and thick ethernet cable ......................................3-15
Fig. 3-8: Star topology of a twisted pair network ...........................................................................3-16
Fig. 3-9: Twisted pair network hardware........................................................................................3-17
Fig. 4-1: Construction of the CP143 H1 / TCP/IP ............................................................................4-1
Fig. 4-2: Location of jumpers............................................................................................................4-3
Fig. 4-3: Front view CP143 H1 / TCP/IP..........................................................................................4-5
Fig. 4-4: The structure of the CP143plus ........................................................................................4-11
Fig. 4-5: The structure of the CP143 TCP/IP..................................................................................4-15
Fig. 4-6: Conversion of ethernet address into an IP address...........................................................4-17
Fig. 4-7: The structure of the indicator word ANZW .....................................................................4-22
Fig. 4-8: Parameter error byte PAFE ..............................................................................................4-30
Fig. 5-1: The menu structure of the parameter configuration program.............................................5-3
Fig. 5-2: File selection window by means of the example for Load/Create.....................................5-6
Fig. 5-3: Sample base file in text form..............................................................................................5-7
Fig. 5-4: Window for remote configuration....................................................................................5-11
Fig. 5-5: CP-base initialization (initial initialization) .....................................................................5-13
Fig. 5-6: Parameters for online connections ..................................................................................5-15
Fig. 5-7: System configuration parameters .....................................................................................5-16
Fig. 5-8: Graphic representation of the real-time clock functions ..................................................5-17
Fig. 5-9: Construction of a synchronized system ............................................................................5-18
Fig. 5-10: Master clock initialization..............................................................................................5-19
Fig. 5-11: Dialog window for the test functions for the clock ........................................................5-23
Fig. 5-12: Structure of configuration windows ...............................................................................5-25
Fig. 5-13: Control field of a parameter configuration window .......................................................5-26
Fig. 5-14: Indirect addressing for TCP ...........................................................................................5-27
Fig. 5-15: Interactive window for multi-connections .....................................................................5-29
Fig. 5-16: List of connections .........................................................................................................5-31
Fig. 5-17: Display window for Ident parameters ............................................................................5-33
Fig. 5-18: Output window of Anzw Dump .....................................................................................5-34
Fig. 5-19: Structure overall status window .....................................................................................5-36
Fig. 5-20: CP-base initialization (initial initialization) ...................................................................5-42
Fig. 5-21: H1 Transport parameters ................................................................................................5-44
Fig. 5-22: Interactive window H1 connections ...............................................................................5-47
Содержание CP143 TCP/IP
Страница 2: ...Lerrzeichen ...
Страница 10: ...Lerrzeichen ...
Страница 16: ...Lerrzeichen ...
Страница 24: ...TCP IP protocol CP143 H1 TCP IP manual 2 8 Rev 00 07 ...
Страница 26: ...LerrzeicLerrzeichenhen ...
Страница 35: ...CP143 H1 TCP IP manual Network planning Rev 00 07 3 9 Fig 3 4 thick ethernet network hardware CP 143 H1 TCP IP ...
Страница 46: ...Standards and specifications CP143 H1 TCP IP manual 3 20 Rev 00 07 ...
Страница 48: ...Lerrzeichen ...
Страница 80: ...Lerrzeichen ...
Страница 158: ...Application in combination with TCP IP CP143 H1 TCP IP manual 5 78 Rev 00 07 ...
Страница 160: ...LerrzLerrzeicheneichen ...
Страница 194: ...Lerrzeichen ...
Страница 196: ...Technical data CP143 H1 TCP IP manual A 2 Rev 00 07 ...
Страница 202: ...List of abbreviations CP143 H1 TCP IP manual C 2 Rev 00 07 ...
Страница 206: ...List of tables CP143 H1 TCP IP manual E 2 Rev 00 07 ...
Страница 210: ...Index CP143 H1 TCP IP manual F 4 Rev 00 07 ...