
Instructions: Low Profile Post System
10. INSTALL THE FIRST POST
Place the Post Assembly in the desired location. Ensure
it is plumb both front and back and side-to-side with a
level. Secure the Mounting Base and Post to the ceiling
using two (2) of the appropriate fasteners (not provided).
Adjust the Mounting Base up to 2” (51mm) to meet the
ceiling if needed (Figure I), then secure the Mounting
Base to the Post Top using two (2) Self-Drilling Screws.
Double check the Post is plumb with a level and secure
the Post to the floor using two (2) of the appropriate fas-
teners (not provided).
11. ATTACH THE FIRST WINE RACK ROWS
Attach one side of the bottom Wine Rack Row Assembly
to the lowest set of mounting holes on the Post using two
(2) Self-Drilling Screws (Figure J).
** Use a low-torque setting on the Power Drill. **
Attach one side of the top and middle Wine Rack Row
Assemblies using two (2) Self-Drilling Screws each.
Use a level and square to ensure each Mounting Plate is
level before fully tightening.
12. BUILD THE SECOND POST
Repeat steps 2-6 to build the Second Post. If installing
more than one connected Low Profile Column, be sure to
pre-drill Mounting Plate Holes on two opposite sides of
the Post.
13. ALIGN AND INSTALL SECOND POST
Use the total width of one Wine Rack Row Assembly to
determine the distance between the inside of the installed
Post and the inside of the next Post.
Place the second Post in the location and ensure
it is plumb both front and back and side-to-side with a
Figure I
Figure J
Figure K
level. Mark and pre-drill mounting hole locations into
the floor and ceiling surfaces, then place the Post
Assembly in the desired location (Figure K).
Ensure it is plumb both front and back and side-to-
side with a level. Secure the Mounting Base and
Post to the ceiling using two (2) of the appropriate
fasteners (not provided).
Adjust the Mounting Base up to 2” (51mm) to meet
the ceiling, then secure the Mounting Base to the
Post Top using two (2) Self-Drilling Screws.