background image

8

www.vintageair.com

901441 REV B 1/30/19, PG 8 OF 9

Operation of Controls

Adjust to desired

speed.

Blower Speed

Adjust to desired

speed.

Adjust to desired

mode position 

(DASH position 

recommended).

Adjust to desired

speed.

Adjust to DEFROST position for maximum defrost, or 

between FLOOR and DEFROST positions for a bi-level 

blend (Compressor is automatically engaged).

Adjust to desired 

temperature.

For A/C operation, adjust to

coldest position to engage 

compressor (Adjust between 

HOT and COLD to reach

desired temperature).

A/C Operation

Heat Operation

Defrost/De-fog Operation

On Gen IV systems with three lever/knob controls, the temperature control toggles between heat and A/C 

operations. To activate A/C, move the temperature lever/knob all the way to cold and then back it off to the desired 

vent temperature. For heat operation, move the temperature lever/knob all the way to hot and then adjust to the 

desired vent temperature. The blower will momentarily change speed, each time you toggle between operations, to 

indicate the change.

Blower Speed

Blower Speed

This lever/knob controls

blower speed, from 

OFF to HI.

This lever/knob controls 

the mode positions,

from DASH to FLOOR

to DEFROST, with a 

blend in between.

This lever/knob controls

the temperature,

from HOT to COLD.

Blower Speed

Mode Control

Temperature Control

Temperature Control

Temperature Control

Temperature Control

Mode Control

Mode Control

Mode Control

For maximum heating, adjust 

to hottest position (Adjust 

between HOT and COLD to 

reach desired temperature).

Adjust to desired

mode position

(FLOOR position 

recommended).

Temperature

Control

Mode

Control

Blower

Speed

Содержание 491241

Страница 1: ...pany Streamline Gen IV ProLine Ellipse Panel Black Anodized 491241 901441 REV B 1 30 19 PG 1 OF 9 18865 Goll St San Antonio TX 78266 Phone 800 862 6658 Sales sales vintageair com Tech Support tech vin...

Страница 2: ...unning the engine with the heater on before evacuating Leak check and charge to specifications The Proper Amount of Refrigerant is Critical to Proper System Operation Vintage Air Recommends Our System...

Страница 3: ...amline Gen IV ProLine Ellipse Before beginning installation open all packages and check contents of shipment Please report any shortages directly to Vintage Air within 15 days After 15 days Vintage Ai...

Страница 4: ...control panel face through the opening in the dash Place the control panel PC board assembly behind the dash and secure it to the control panel face using the 4 8 32 x 3 8 screws See Figure 1 and 2a P...

Страница 5: ...Panel PC Board Assembly Rear View Side View Thread Into Back Side of Control Panel Face Opening in Dash ECU 232007 VUR Gen IV Universal Control Harness Control Panel Face Snug Against Back Side of Das...

Страница 6: ...rol panel face See Figure 3 below Hold the PC board assembly and pull it away from the dash until the board comes loose from the control panel face See Figure 4 below NOTE The control panel knobs will...

Страница 7: ...VUR 232002 VUA CIRCUIT BREAKER 30 AMP WIDE OPEN THROTTLE SWITCH OPTIONAL DASH LAMP IF USED Dash Lamp Is Used Only With Type 232007 VUR Harness Warning Always Mount Circuit Breaker As Close to the Batt...

Страница 8: ...emperature lever knob all the way to cold and then back it off to the desired vent temperature For heat operation move the temperature lever knob all the way to hot and then adjust to the desired vent...

Страница 9: ......

Страница 10: ...9 www vintageair com 901441 REV B 1 30 19 PG 9 OF 9 Packing List Control Panel Kit 491241 No 1 Qty 1 Part No 491241 Description Streamline Gen IV ProLine Ellipse Checked By Packed By Date 1...

Отзывы: