Level This Line
2.320”
5.320”
Template For
48104-RHQ
Control Panel Installation
Streamline Control Panel Template
1.
Select a suitable location for the control panel. Consider heater control valve location, wiring harness
length and capillary tube to evaporator distance.
2.
After selecting a location for the panel, mask the area 3
½
”(tall) x 5
½
”(wide).
3.
Cut out grey section of template on dotted line.
4.
Mark dash with marker or scribe.
NOTE: Be sure to level template on dash.
5.
Cut out opening for panel.
6.
Remove backing plate from face.
7.
Install face in dash and reinstall backing plate, making sure the wires for the lights exit the holes in the
backing plate.
8.
Install the nuts with star washers, and then the bracket and nyloc nut. Do not overtighten the nyloc nut.
9.
Tie one wire from each light bulb together and run them to a ground.
10.
Tie the other wires together and connect to the wire in your vehicles harness that powers your instrument
panel lights (+12 volts).
11.
Wire according to the wiring diagram on Page 7 for Gen II Compac & Gen II Super Units, or see Page 8 for
the Gen II Mini.
12.
Insert capillary tube through the sticker on top of the evaporator, the entire thickness of the coil.
NOTE: Ensure that template measures to dimensions noted above prior to cutting dash.
Содержание 48104-RHQ
Страница 1: ...Streamline Control Panel 48104 RHQ ...