11
1966-67 CHEVELLE
WITH AC
904466 REV A 5/8/09 , 1966-67 CHEVELLE w AC EVAP INSTR PG 11 OF 22
FRESH AIR COVER INSTALLATION
FIGURE 10
KICK PANEL FRESH AIR CAP INSTALLATION
INSTALL (4) GROMMETS IN KICK PANEL FRESH AIR CAP, SEE FIGURE 10a
BELOW.
ROUTE A/C AND HEATER HOSE THROUGH AC BLOCK-OFF PLATE AND
KICK PANEL FRESH AIR CAP AS SHOWN IN FIGURE 10 AND 10b, BELOW.
APPLY A 1/4” BEAD OF SILICONE AROUND THE BACK SIDE
OF KICK PANEL FRESH AIR CAP AS SHOWN IN FIGURE 10a, BELOW.
SECURE KICK PANEL FRESH AIR CAP USING (8) #8 x 1 1/4” PH PAN
HEAD SCREWS, AS SHOWN IN FIGURE 10b BELOW.
#10 A/C
HOSE
#6 A/C
HOSE
(2) HEATER
HOSE
FIGURE 9
INSTALL (4) GROMMETS IN AC BLOCK-OFF PLATE AS SHOWN IN FIGURE 9 BELOW.
APPLY A 1/4” BEAD OF SILICONE AROUND THE BACK SIDE OF THE AC BLOCK-OFF PLATE AS
SHOWN IN FIGURE 9 BELOW.
INSTALL THE AC BLOCK-OFF PLATE USING (8) #14 x 3/4 SHEET METAL
SCREWS AS SHOWN IN FIGURE 9 BELOW.
APPLY A 1/4” BEAD OF SILICONE AROUND THE BACK SIDE OF
THE HEATER/ BLOWER COVER AS SHOWN IN
FIGURE 9 BELOW.
INSTALL THE HEATER/ BLOWER COVER
USING (4) #14 x 3/4” SHEET METAL
SCREWS, SHOWN IN FIGURE 9.
DRILL (2) 3/16 AND (2) 5/16 HOLES IN
FIREWALL USING THE HEATER BLOWER
COVER AS TEMPLATE. INSTALL (2) #14
x 3/4” SHEET METAL SCREWS AND (1) 1/4
- 20 x 1” BOLT w/FLAT WASHER AND 1/4
NUT w/ STAR WASHER. SEE FIGURE 9,
BELOW.
DRILL 3/16
HOLE
IN FIREWALL
(6) #14 x 3/4
SHEETMETAL
SCREWS
DRILL 3/16
HOLE
IN FIREWALL
1/4”
NUT/w
STAR WASHER
DRILL (2) 5/16
HOLES
IN FIREWALL
1/4-20 x 1”
BOLT w/
FLAT WASHER
(8) #14 x 3/4
SHEET METAL
SCREWS
(4) GROMMETS
(8) #8 x 1 1/4”
PH PAN HEAD
SCREWS
#10 A/C
HOSE
#6 A/C
HOSE
(2)HEATER
HOSES
FIGURE 10b
FIGURE 10a
SILICONE
SILICONE
SILICONE
BACKSIDE OF
KICK PANEL
FRESH AIR CAP
(4)GROMMETS
33137-VUI