ViM BATE-R010 Скачать руководство пользователя страница 6

 

6/8 

NT00000592-BATE-R-010-AN-191114

4.2 

BATE-R010 Single-phase - Power ≥ 4kW

airflow
controller

auto
reset

manual
reset

Command signal

1 phase power supply

according to NF C 15-100 standard

Safety
thermostat

L1

N

50°C

θ

100°C

θ

B

C

PTC

BATE-R010

PE

9

6

5

10

0...10VDC

N

L

230V 50Hz

≥4kW

Equipment

Included

Optional

BATE R010

Electrical heater

MCR1

Post-ventilation delay

4.3  BATE-R010 Three-phase - Power < 18kW

3 phases power supply

airflow
controller

auto
reset

manual
reset

Command signal

according to NF C 15-100 standard

Safety
thermostat

0...10VDC

50°C

θ

100°C

θ

B

C

PTC

BATE R010

PE

9

6

5

10

400V 50Hz

L1

L2

L3

L1
L2
L3

Equipment

Included

Optional

BATE R010

Electrical heater

MCR1

Post-ventilation delay

Содержание BATE-R010

Страница 1: ...NSTRUCTION MANUAL INSTALLATION WIRING COMMISSIONING MAINTENANCE AFNOR CERTIFICATION ISO 14001 Environnement AFNOR CERTIFICATION ISO 9001 Q u a l i t BATE R010 Circular electrical heater with built in...

Страница 2: ...instructions carefully as they contain important infor mation for your safety and user safety during installation operation and maintenance of this product Once installation is complete ensure this ma...

Страница 3: ...ent is covered by a 12 month warranty Only parts from the date of invoice The seller undertakes to replace all parts or equipment that we recognise as malfunctioning to the exclu sion of any damages o...

Страница 4: ...0 2 850 BATE R010 400 3 000W Single phase 3 000 13 0 9 1 276 376 470 50 0 680 4 600 BATE R010 400 5 000W Single phase 5 000 21 7 10 2 276 376 470 50 0 680 4 600 400V Three phase power supply BATE R010...

Страница 5: ...equipped with two safety thermostats to avoid overheating An automatic reset safety thermostat 50 C and a manual reset safety thermostat 100 C located on the cover They must control an external contac...

Страница 6: ...5 10 0 10VDC N L 230V 50Hz 4kW Equipment Included Optional BATE R010 Electrical heater MCR1 Post ventilation delay 4 3 BATE R010 Three phase Power 18kW 3 phases power supply airflow controller auto re...

Страница 7: ...f the fan without the heater shutting off beforehand MCR1 type post ventilation delay if necessary or at the same time to be avoided Post ventilation block diagram BDEZ Safety thermostats fitted withi...

Страница 8: ...tivated Once the error has been corrected press the man ual safety thermostat reset button on the electrical heater cover 5 3 Maintenance Regular inspection of connections Disassemble and clean the e...

Отзывы: