![Viking L-3 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/viking/l-3/l-3_installation-instructions-manual_1024281018.webp)
VIKING TECHNICAL SUPPORT 1.800.908.0884
1 6
Operator Positioning
!
IMPORTANT:
All openings of a horizontal slide gate are guarded or screened from the bot-
tom of the gate to a minimum of 4 feet (1.22 m) above the ground to prevent a 2-1/2 inch
(57.2 mm) diameter sphere from passing through the openings anywhere in the gate, and
in that portion of the adjacent fence that the gate covers in the open position.
GATE OPERATOR INSTALLATION