TECHNICAL DATA

3” MODEL G-3000P 

DOUBLE INTERLOCK PREACTION 

WITH ELECTRIC/PNEUMATIC RELEASE

The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058

Telephone: 269-945-9501  Technical Services: 877-384-5464  Fax: 269-818-1680  Email: [email protected]

Page 8 of 12

Form No. F_011610      18.10.25    P65

6.  INSPECTION AND OPERATIONAL TEST

NOTICE: THE OWNER IS RESPONSIBLE FOR MAINTAINING THE FIRE PROTECTION SYSTEM AND DEVICES IN PROPER 

OPERATING CONDITION. 

It is imperative that the system is inspected and tested on a regular basis in accordance with NFPA 25. 

The frequency of the inspections may vary due to contaminated water supplies, corrosive water supplies, corrosive atmospheres, as 

well as the condition of the air supply to the system. For minimum maintenance and inspection requirements, refer to NFPA 25. In ad-

dition, the Authority Having Jurisdiction may have additional maintenance, testing, and inspection requirements that must be followed. 

Viking does not require internal inspection of the valve as part of routine inspection and testing. Internal maintenance is generally only 

required for valve repairs and internal component replacement.

WARNING:

 Any system maintenance that involves placing a control valve or detection system out of service may eliminate the fire 

protection capabilities of that system. Prior to proceeding, notify all Authorities Having Jurisdiction. Consideration should be given to 

employment of a fire patrol in the affected areas.

A.  Low Air Pressure Alarm Test: 

(Refer to Figure 5) 

Quarterly testing of low air alarms is recommended.

To Test Sprinkler System “Low Supervisory Air” Alarm:

1.  To prevent operation of the G-3000P Valve and filling the system with water during the test, DO NOT operate the electric 

detection system during test. Consider closing the main water supply control valve.

2.  Fully open the sprinkler system test connection.

3.  Verify that low air alarms operate within an acceptable time period and continue without interruption.

4.  Close the test connection.

5.  Establish recommended pneumatic supervisory pressure to be maintained. Refer to section 4. INSTALLATION.

6.  Reset the system release control panel. Alarms should stop.

When testing is complete, return the system to service following steps 1 through 8 below.

B.  Full Flow Trip Test: 

(Refer to Figure 5)

Performance of a trip test is recommended annually during warm weather. Consider coordinating this test with operation testing 

of the detectors.

CAUTION! PERFORMANCE OF THIS TEST WILL CAUSE THE G-3000P VALVE TO OPEN AND THE SPRINKLER SYSTEM TO 

FILL WITH WATER.

To Trip Test the Electric / Pneumatic Double-Interlocked Preaction System:

1.  Notify the Authority Having Jurisdiction and those in the area affected by the test.

2.  Trip the G-3000P Valve by performing option “a” or “b” below.

a.  Operate the electric release control system according to the manufacturer’s instructions, and open the sprinkler system 

test connection.

b.  Operate the emergency release valve.

3.  The G-3000P Valve should open, filling the sprinkler system with water. Water flow alarms should operate.

4.  Verify that there is adequate flow from the sprinkler system test valve.

When Trip Testing is complete:

5.  Perform steps 1 through 13 of section 4.F. PLACING THE SYSTEM IN SERVICE to return the system to service.

6.  Notify the Authority Having Jurisdiction and those in the affected area that testing is complete.

7. MAINTENANCE

Viking does not require an internal inspection of the G-3000P Valve unless there is an indication of damage to internal components.

A.   Taking the system out of service: 

(Refer to Figure 5)

1.  Close the water supply main control valve, placing the system out of service.

2.  Open the flow test valve located in the base of the G-3000P Valve.

3.  Close the air (or nitrogen) supply to the preaction system piping.

4.  Close the priming valve.

5.  Relieve all pressure from the preaction system piping. If the system has operated, open main drain valve to allow the system 

to drain completely.

B.   Removing the Cover from the Valve Body: 

(Refer to Figures 1 & 11)

1.  Remove the 3” grooved coupling from the top of the G-3000P Valve.

2.  Remove the 12” section of pipe directly above the G-3000P Valve.

3.  Break the 1/2” coupling between the air pressure gauge and air pressure supervisory switch.

4.  Remove the 1-1/4” grooved coupling below the main drain.

Содержание G-3000P

Страница 1: ...the system piping network The entire sprinkler system fills with water Double interlock electric pneumatic release preaction systems are commonly used in cold storage applications and other areas where it is important to control accidental water dis charge due to inadvertent damage to the sprinkler piping 2 LISTING AND APPROVALS cULus Listed VLFT FM Approved Refrigerated Area Sprinkler Systems 3 T...

Страница 2: ...ECTRIC PNEUMATIC RELEASE The Viking Corporation 210 N Industrial Park Drive Hastings MI 49058 Telephone 269 945 9501 Technical Services 877 384 5464 Fax 269 818 1680 Email techsvcs vikingcorp com Page 2 of 12 Form No F_011610 18 10 25 P65 Figure 1 Air Supply Options ...

Страница 3: ...of the most common are 122 Cu Ft at 1 900 PSI 3 455 L at 131 bar 225 Cu Ft at 2 100 PSI 6 372 L at 145 bar and 280 Cu Ft at 2 300 PSI 7 930 L at 159 bar When nitrogen cylinders are used as a primary air supply spare cylinders should be furnished and located at the valve location To determine the approximate amount of nitrogen to be furnished the following formula may be used Table 1 Pipe Capacity ...

Страница 4: ...Supply Installation 1 Install the required air supply as described in section 4 B The size of the compressor and amount of air required should be determined in accordance with Tables 1 2 3 The air or nitrogen supply to the preaction system must be clean dry and oil free 2 Automatic air supplies must be regulated restricted and from a continuous source A Viking Air Maintenance Device should be inst...

Страница 5: ...sing the valve Verify prime pressure has been established on the prime pressure gauge 8 Establish air pressure on the system 9 Verify that no water flows from the drip check when the plunger is pushed 10 When the priming pressure has been verified as being established slowly open the water supply control valve 11 When flow is developed from the flow test valve CLOSE the flow test valve 12 Fully op...

Страница 6: ... 18 10 25 P65 Figure 6 Set Position 5 OPERATION A In the Set position When air pressure is introduced into the sprinkler piping the sensing end of the pneumatic actuator is pressurized This closes the pneumatic actuator The closed pneumatic actuator and the normally closed solenoid valve prevent prime water from escap ing the prime chamber of the G 3000P Valve When prime water enters the prime cha...

Страница 7: ...point the prime water is still held in the prime chamber by the closed pneumatic actuator When a sprinkler operates air pressure is lost on the sensing end of the pneumatic actuator causing the pneumatic actuator to open With both the pneumatic actuator and solenoid valve open prime water is drained from the prime chamber causing the G 3000P Valve to open filling the sprinkler piping with water Wa...

Страница 8: ...ory pressure to be maintained Refer to section 4 INSTALLATION 6 Reset the system release control panel Alarms should stop When testing is complete return the system to service following steps 1 through 8 below B Full Flow Trip Test Refer to Figure 5 Performance of a trip test is recommended annually during warm weather Consider coordinating this test with operation testing of the detectors CAUTION...

Страница 9: ...lats of the coupling 6 remove the coupling 6 from the valve body 1 3 Inspect the coupling 6 and O rings 5 Replace if necessary using the instructions in O Ring Replacement Bulletin F_ 120611 F Removing Replacing the Prime Chamber Assembly Refer to Figure 11 1 The prime chamber assembly 4 is now held in place by two flanges on the outside diameter of the assembly Slide the prime chamber assembly 4 ...

Страница 10: ...orm No F_011610 18 10 25 P65 Figure 9 Optional Accessories Accessories 08055 Model E 1 Accelerator 14800 Model LD 1 Anti Column Device 16212 Drain Manifold Figure 8 16191 1 Assembly Part Number 16191 1 1 Model G 3000P Valve 1 Model G 3000P Double Interlock Electric Pneumatic Release Trim Includes NC Solenoid Pneumatic Actuator 1 12 Section of Schedule 10 Pipe and Coupling 1 Air Pressure Supervisor...

Страница 11: ...RIC PNEUMATIC RELEASE The Viking Corporation 210 N Industrial Park Drive Hastings MI 49058 Telephone 269 945 9501 Technical Services 877 384 5464 Fax 269 818 1680 Email techsvcs vikingcorp com Page 11 of 12 Form No F_011610 18 10 25 P65 Figure 10 Installation Dimensions ...

Страница 12: ...pper or UNS S30400 Stainless Steel 1 3 Anaerobic Adhesive 1 4 16075 Prime Chamber Assembly Brass EPDM Nitrile 304 Stainless Steel Bronze Alloy 1 5 O Rings EPDM and Nitrile 2 or 3 6 16074 Coupling UNS S17400 Stainless Steel 1 7 15941 Check Diaphragm EPDM 1 8 08081 1 2 13 x 1 1 4 HHS UNS S30400 Stainless Steel 10 9 Cover 65 45 12 Ductile Iron 1 10 Data Plate Aluminum 2 11 Tack Alloy Carbon Steel 4 R...

Отзывы: